[E16] Yokohama Yokosuka Road Hino IC In-bound Line Entrance Ramp Notice of Closure at Night

~ We will repair damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E16] Yokohama Yokosuka Road Hino IC In-bound Line Entrance Ramp Notice of Closure at Night

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 451KB]

October 2, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

At NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), the E16 Yokohama Yokosuka Road (hereinafter "Yokoyokomichi") Hino Interchange (hereinafter "IC") will be closed at night due to pavement repair work at the In-bound entrance ramp. carry out.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Closing location and date and time

  1. Closure location:
    Yokoyokomichi In-bound Line Hino IC Entrance Ramp
  2. Image of closed area
    • The signs such as E16 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    October 16th (Monday) to 20th (Friday), 23rd (Monday), 5th year of Reiwa
    Every day from 21:00 to 5am the next morning
    Preparation day:
    October 24th (Tue) to 27th (Fri), 30th (Mon), 2023
    Every day from 21:00 to 5am the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In case of rain, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the map below for detour routes.
As indicated by the  pink arrow, if you detour via Prefectural Route 21 and Hirado Route 486, it will take about 12 minutes (usually about 5 minutes).
In addition, large vehicles cannot enter from Bessho IC. As indicated by the blue arrows, use Kariba IC and Nagata IC via Kanjo Route 2 and National Route 1. The required time is expected to take about 19 minutes (usually about 7 minutes).
Due to the detour, the required time will be longer, so please leave with plenty of time.

Image of detour
Image of [Legend]

3. Construction overview

Yoko-Yokomichi In-bound Line The Hino IC entrance ramp will be closed at night for pavement repair work.
The section where this work will be carried out is a single lane, and since construction cannot be carried out under normal lane restrictions, it is necessary to work with the ramp closed. Therefore, in order to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of Expressway.

Photo of pavement damage situation Image of caption of pavement damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official accounts of Twitter and LINE.
    [Twitter]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) real-time traffic information
    "NEXCO EAST (Kanto Construction Regulations)" (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.