[E51] Higashi-Kanto Expressway In-bound Line Wangan Chiba IC Exit Ramp
Notice of night closure

From February 5th (Monday) to February 8th (Thursday) from 9:00 pm to 5:00 am the next morning
~We will carry out repair work on the damaged sound insulation wall~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E51] Higashi-Kanto Expressway In-bound Line Wangan Chiba IC Exit Ramp Notice of Night Closure

The latest regulatory information isDraTraPlease see.

PDFバージョン【PDF:671KB】

January 22, 2020
East Nippon Expressway Co., Ltd.
Chiba Management Office

At the NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture), In-bound the E51 Higashi-Kanto Expressway (hereinafter referred to as the "Higashi-Kanto Expressway") Line The exit ramp of the Wanganchiba Interchange (hereinafter referred to as "IC") will be closed at night to repair the sound insulation wall.
We apologize for any inconvenience this may cause, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Closing location and date and time

  1. Closed location:
    Higashi Kanto Expressway In-bound Line Wangan Chiba IC exit (from Narita direction) ramp
  2. Image of closed area
    • Attached to each line E51 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    February 5th (Monday) to February 8th (Thursday), 2020
    Every day from 21:00 to 5am the next morning
    Preparation day:
    February 13th (Tuesday) to 16th (Friday), 2020
    Every day from 21:00 to 5am the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

Please refer to the diagram below for detours.
If you take a detour between Higashi-Kanto Expressway Miyanogi JCT and Wangan Chiba IC via Keiyo Road, Prefectural Route 57, and Chiba City Road Nakase Makuharicho Line, it is expected to take approximately 13 minutes (normally approximately 7 minutes).
The detour will increase the travel time, so please allow plenty of time for your trip.

Image of detour

3. Construction overview

Since the sound insulation wall is damaged at the exit ramp of the Gulf Chiba IC on the Higashi-Kanto Expressway In-bound Line, we will carry out sound insulation wall repair work. The section where this work is to be carried out is one lane, and since it is not possible to carry out construction under normal lane regulations, it is necessary to close the ramp and carry out the work.
Therefore, in order to minimize inconvenience to our customers, we will close the ramps on weekday evenings when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

Photograph of damage situation of sound insulation wall
Caption image of sound barrier damage
Sound insulation wall repair work Photos of work status
Sound insulation wall repair work Image of work status caption

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • iPhone / Android application "E-High Radi"
    It delivers real-time emergency information such as accidents and falling objects that occurred most recently in the direction of travel.
    https://www.driveplaza.com/traffic/e-highwayradio/
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)"
    (@e_nexco_kanto) Real-time traffic information
    "NEXCO EAST (Kanto construction regulations)"
    (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.