[E6] Joban Expressway In-bound) Hitachi Chuo PA (nighttime closure)
[E6] Joban Expressway / [E50] Higashi-Mito Road Nighttime Ramp Closure Notice

~We will carry out pavement repair work~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E6] Hitachi Chuo PA on Joban Expressway In-bound) Nighttime Closure [E6] Joban Expressway / [E50] Notice of Nighttime Ramp Closure Higashi-Mito Road

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 282KB】

March 9, 2020
East Nippon Expressway Co., Ltd.
Mito Management Office

NEXCO EAST Mito Management Office (Mito City, Ibaraki Prefecture) E6 Joban Expressway (hereinafter referred to as "Joban Expressway") and E50 Due to pavement repair work being carried out on the ramps of Higashi-Mito Road, the ramps at the interchange (hereinafter referred to as "IC") will be closed at night.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when going out.

1. Lamp closure location and date and time

number Road name Closed point period Attachment
E6
Joban Expressway
上り線 日立中央パーキングエリア(以下「PA」)
上り線 日立中央IC
(常磐道 上り線 いわき方面から日立中央ICへ流出するランプ)
March 23rd (Monday) - March 24th (Tuesday)
8:00 PM to 5:00 AM each night
資料-1【PDF:508KB】
上り線 日立南太田IC
(常磐道 上り線 いわき方面から日立南太田ICへ流出するランプ)
March 25th (Wednesday) - March 27th (Friday)
8:00 PM to 5:00 AM each night
Material-2 [PDF: 409KB]
上り線 日立北IC
(日立北料金所から常磐道 上り線 東京方面へ流入するランプ)
March 30th (Monday) - April 1st (Wednesday)
8:00 PM to 5:00 AM each night
資料-3【PDF:415KB】
E50
Higashi-Mito Road
西行き ひたちなかIC
(ひたちなか料金所から東水戸道路 西行き 宇都宮方面へ流入するランプ)
April 2 (Thursday)
8:00 PM to 5:00 AM the next morning
資料-4【PDF:450KB】
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  1. In stormy weather, it will be postponed to the spare day.
  2. Please see the attached document [PDF: 1.2MB] for information on backup dates and detours in case of postponement.
  3. After the construction work for closure ① is completed, the construction work for closure ② will be carried out, so closures ① and will not be carried out simultaneously.
  4. If Closure ②, Closure ③, or Closure ④ is postponed due to bad weather, construction will be carried out on a backup date after Friday, April 3rd.
    The order of construction work on the reserve day will be ②⇒③⇒④.
  5. The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Construction overview

Due to road surface damage at the interchanges on Joban Expressway and Higashi-Mito Road, pavement repair work will be carried out.
As the construction work cannot be carried out under normal lane restrictions, it will be necessary to close the ramps during the work. Therefore, in order to minimize inconvenience to customers, the ramps will be closed during the night on weekdays when traffic volume is low, and the work will be carried out in a concentrated and efficient manner. This work is necessary to ensure safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Road surface damage photo Caption image of the road damage situation
Pavement repair work work status photo Image of caption of work status for pavement repair work

3. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.