[E4] Tohoku Expressway Yabuki IC
Notice of nighttime closure of entrance and exit lamps

March 4th (Monday) to March 6th (Wednesday), March 11th (Monday) to March 13th (Wednesday), 2020
From 8:00 pm to 5:00 am the next morning every day
~Tollgate roof renovation work will be carried out~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4] Tohoku Expressway Yabuki IC entrance/exit lamp night closure notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 885KB]

February 6, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Koriyama Management Office

NEXCO EAST Koriyama Management Office (Koriyama City, Fukushima Prefecture) will carry out renovation work on the toll plaza roof at the entrance and exit ramps of the E4 Tohoku Expressway (hereinafter "Tohoku Expressway") Yabuki Interchange (hereinafter "IC"). Implement closure.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. Closed location and date and time

  1. Closed location:
    Tohoku Expressway Yabuki IC entrance ramp/exit ramp
  2. Image of closed area
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • Attached to each line E4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Entrance ramp closure date:
    March 4th (Monday) to March 6th (Wednesday), 2020
    Every night from 20:00 to 5:00 the next morning
    Exit ramp closure implementation date:
    March 11th (Monday) to March 13th (Wednesday), 2020
    Every night from 20:00 to 5:00 the next morning
    Preparation day:
    March 7th (Thursday) - March 8th (Friday), March 14th (Thursday) - March 15th (Friday)
    March 18th (Monday) - 19th (Tuesday), March 21st (Thursday) - 22nd (Friday)
    March 25th (Monday) - March 29th (Friday)
    Every night from 20:00 to 5:00 the next morning
Image of date and time and legend
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detour information, please refer to the attached document [PDF: 338KB].
The detour will increase the travel time, so please allow plenty of time for your trip.

3. Construction overview

Pillar installation work will be carried out to rebuild the toll gate roof at the entrance and exit lanes of Yabuki IC Tohoku Expressway. There are two lanes where this work will be carried out, and since the work cannot be carried out under normal lane regulations, it is necessary to close the ramp.
Therefore, in order to minimize the inconvenience to customers, the ramp will be closed on weekday nights when traffic is light, and construction will be carried out intensively and efficiently. This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.

柱建方状況のイメージ画像
Pillar erection situation
Photos of girders erection work
Laying work status

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)"
    (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.