[E4A] Hachinohe Expressway both inbound and outbound lanes, between Hachinohe JCT and Hachinohe Kita IC
[E4A] Momoishi Toll Road (up and down lines) between Hachinohe Kita IC and Shimoda Hyakuseki IC
[E45] Hachinohe-Kuji Expressway both inbound and outbound lanes, between Hachinohe Korekawa IC and Hachinohe JCT
Nighttime road closure notice

September 29th (Monday) to October 3rd (Friday) 8:00 PM to 6:00 AM each day
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4A] Hachinohe Expressway (both inbound and outbound lanes) between Hachinohe JCT and Hachinohe Kita IC [E4A] Momoishi Toll Road (both inbound and outbound lanes) between Hachinohe Kita IC and Shimoda Hyakukoku IC [E45] Hachinohe-Kuji Expressway (both inbound and outbound lanes) between Hachinohe Korekawa IC and Hachinohe JCT Nighttime road closures

The latest regulatory information isDraTraPlease see.

PDFバージョン【PDF:749KB】

August 29, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Hachinohe Management Office

NEXCO EAST Hachinohe Management Office (Hachinohe City, Aomori Prefecture) E4A From Hachinohe Junction (hereinafter referred to as "JCT") on the Hachinohe Expressway to Hachinohe Kita Interchange (hereinafter referred to as "IC"), from Hachinohe JCT to the Hachinohe JCT toll gate, E4A From Hachinohe Kita IC on the Hyakukoku Momoishi Toll Road to Shimoda Momoishi IC, E45 There will be a nighttime road closure from Hachinohe-Kuji Expressway to carry out pavement repair work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed section and date and time

  1. Closed section
    [1] Hachinohe Expressway
    Between Hachinohe JCT and Hachinohe Kita IC (both inbound and outbound lanes), Hachinohe JCT to Hachinohe JCT toll gate (Out-bound lanes)
    [2] Momoishi Toll Road
    Hachinohe Kita IC to Shimoda Hyakuseki IC (both inbound and outbound lanes)
    [3] Hachinohe-Kuji Expressway
    Hachinohe Korekawa IC to Hachinohe JCT toll gate (both inbound and outbound lanes)
  2. Image image of closed section
    • The designations such as E4A attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    • [1] Hachinohe Expressway, Hachinohe JCT to Hachinohe Kita IC (both inbound and outbound lanes), Hachinohe JCT to Hachinohe JCT toll gate (Out-bound lanes)
      Implementation date:
      Monday, September 29, 2020 - Friday, October 3, 2020
      Every day from 20:00 to 6:00 the next morning
    • [2] Momoishi Toll Road Hachinohe Kita IC - Shimoda Hyakukoku IC (up and down)
      Implementation date:
      September 29th (Monday) to September 30th (Tuesday), 2020
      Every day from 20:00 to 6:00 the next morning
    • [3] Hachinohe-Kuji Expressway Hachinohe Korekawa IC to Hachinohe JCT toll gate (both inbound and outbound lanes)
      Implementation date:
      Monday, September 29, 2020
      From 20:00 to 6:00 the next morning
    • [1] to [3] Backup days:
      October 6th (Monday) to October 8th (Wednesday), 2020
      Every day from 20:00 to 6:00 the next morning
通行止めカレンダーのイメージ画像
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • When section [3] is closed, it will be impossible to travel from Hachinohe-Kuji Expressway Hachinohe-Korekawa IC to Hachinohe Expressway towards Morioka.
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

 迂回にあたっては、別紙-1【PDF:219KB】別紙-2【PDF:267KB】別紙-3【PDF:266KB】をご参照ください。
 迂回により所要時間が長くなりますので、お時間にゆとりをもってお出かけください。

3. 3. Construction details

Due to road surface damage, pavement repair work will be carried out on the Hachinohe Expressway between Hachinohe JCT and Hachinohe Kita IC (both inbound and outbound lanes) and from the Hachinohe JCT toll gate (both Out-bound lanes). Along with information board renewal work, new support posts and equipment will be installed and existing equipment will be removed on the Momoishi Toll Road between Hachinohe Kita IC and Shimoda Hyakukoku IC (both inbound and outbound lanes). In addition, repair work will be carried out inside the tunnel on the Hachinohe-Kuji Hachinohe-Kuji Expressway IC and the Hachinohe JCT toll gate. To minimize inconvenience to customers, road closures will be implemented during the night on weekdays when traffic volume is low, and work will be carried out in a concentrated and efficient manner. This work is necessary to ensure safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Photograph after pavement repair (image)
After pavement repair (image)

4. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。