[C4] Ken-o Expressway Bando IC ~ Joso IC
Notice of nighttime road closure

~ Paving work and pavement repair work will be carried out in conjunction with the new construction of Bando PA ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C4] Notice of nighttime traffic closure between Bando IC and Joso IC Ken-o Expressway

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 602KB】

January 31, 2020
East Nippon Expressway Co., Ltd.
Tsukuba construction office
Kazo management office

NEXCO EAST Tsukuba Construction Office (Tsukuba City, Ibaraki Prefecture) and Kazo Management Office (Kazo City, Saitama Prefecture) are operating the C4 Ken-o Expressway (hereinafter “Ken-O Ken-O Road”) Bando Interchange (hereinafter “IC”). '') ~ At Joso IC, there will be nighttime traffic closures due to paving work related to the new construction of the Bando Parking Area (hereinafter referred to as "PA"), as well as road surface pavement repair and repair of road structures.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. Closed section and date and time

  1. Road closure section:
    Ken-O Road Inner and Outer Bando IC - Joso IC
  2. Image image of closed section
    • Attached to each line C4 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    February 26th (Monday) to March 1st (Friday), 2020
    Every night from 20:00 to 5:00 the next morning
    • Excluding Saturdays, Sundays, and holidays
    Preparation day:
    March 4th (Monday) to March 8th (Friday), 2020
    Every night from 20:00 to 5:00 the next morning
    • Excluding Saturdays, Sundays, and holidays
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the same day.

2. Detour

For detour information, please refer to Attachment 1 [PDF: 213KB].
The detour will increase the travel time, so please allow plenty of time for your trip.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily leave Expressway due to road closures, detour through the closed section, re-enter and transfer in the forward direction, we will implement "transfer adjustment" in which the toll fee will be adjusted according to the section used. Masu. (See Attachment 2 [PDF: 167KB])

Transfer IC

Closed place Outflow designation IC Re-inflow IC
[Ken-O Road] Inner loop Joso IC⇒Bando IC
(From Tsukuba area to Hachioji area)
[Ken-O Road] Inner loop Joso IC, Tsukuba Chuo IC [Ken-O Road] Inner loop Bando IC, Sakai Koga IC, Goka IC
[Ken-O Road] Outer loop Bando IC ⇒ Joso IC
(From Hachioji area to Tsukuba area)
[Ken-O Road] Outer loop Bando IC, Sakai Koga IC [Ken-O Road] Outer loop
Joso IC, Tsukuba Chuo IC, Tsukuba Ushiku IC
[Joban Expressway] In-bound line Yatabe IC
[Joban Expressway] Out-bound line Sakuratsuchiura IC

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

Between Bando IC and Joso IC on Ken-O Road, we will carry out paving work in conjunction with the new construction of Bando PA, as well as road surface pavement repair and repair of road structures. In order to minimize the inconvenience to customers, we will close the road on weekday nights when traffic is light and carry out construction work intensively and efficiently. We ask for your understanding and cooperation so that you can use Expressway safely and comfortably.

Photo of paving work progress Pavement construction Image image of the caption of the work status
Image of road structure repair work status Road structure repair work status caption image

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Posters and leaflets will be displayed at nearby toll gates and rest facilities.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)"
    (@e_nexco_kanto) Real-time traffic information
    "NEXCO EAST (Kanto construction regulations)"
    (@e_nexco_kanto_k) Judgment on implementation of construction regulations
    [LINE]
    “NEXCO EAST” (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.