Damage to the water leakage prevention plate inside the box culvert on the Do-O Expressway (between Noboribetsu Muroran IC and Noboribetsu East IC)

April 6, 2013
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

The water leakage prevention plate of the box culvert on the Do-O Expressway managed by NEXCO EAST Hokkaido Regional Head Office (Atsubetsu Ward, Sapporo City) was damaged, causing a fall event. No damage such as injuries or property damage has been confirmed.

We immediately perform an emergency inspection of the box culvert and confirm that there is no problem with safety. We apologize for any inconvenience caused to our neighbors.

1 History of discovery

1st report to our company About 9:50 on April 5, 2013 (Friday), from the Noboribetsu branch office of the Muroran Construction Management Department in Hokkaido, when the residents near the site were informed that the leak prevention plate had dropped. We contacted us and confirmed that the leak prevention plate had been damaged and dropped on site.

2 Occurrence location

Do-O Expressway Michimichi 782 No. Kaminoboribetsu Muroransen cross box culvert from Noboribetsu Muroran interchange between Noboribetsuhigashi Interchange (near S105.1KP)

Place name: Chitose-cho, Noboribetsu-shi, Hokkaido (Hokkaido Noboribetsu Chitosecho)

3 Damaged water leakage prevention plate

Width 2m x height 0.91m x thickness 2.2cm (19kg) x 3 sheets

4 Cause of damage

It is highly probable that the ice grew due to the freezing of water on the inner surface of the leak prevention plate, and the pressure caused the ice to damage the attachment part of the leak prevention plate and drop it.

5 Response status of the box culvert

Due to the occurrence of an event, an emergency inspection was carried out on April 5, and it has been confirmed that there are no problems with safety.

[Damage status]

Image of damage situation

Damaged water leakage prevention plate
Width 2m x height 0.91m x thickness 2.2cm (19kg) x 3 sheets