Report on emergency inspection result of prestressed concrete bridge using polyethylene cylinder tube.
- Corporate Top
- Press Room
- Press Release Headquarters
- Report on emergency inspection result of prestressed concrete bridge using polyethylene cylinder tube.
April 9, 2008
East Nippon Expressway Co., Ltd.
Central Japan Expressway Co., Ltd.
West Japan Expressway Co., Ltd.
East Nippon Expressway Co., Ltd. ・Central Japan Expressway Co., Ltd.・Western Japan Expressway Co., Ltd. (hereinafter NEXCO3 company) is a prestressed polyethylene tube (hereinafter PE sheath) at Expressway. We have completed an emergency inspection of a concrete bridge, and we will inform you about the results.
1 Inspection result
NEXCO3 carried out an inspection of the prestressed concrete bridge using PE sheath during construction and operation, and it was found that there were no changes when it was inspected from March 27 to April 7, 2008.
2 Inspection method
For the bridges in service, we got off the inspection vehicle and visually inspected the pavement surface and the underside of the bridge from the ground. For the bridge under construction, we also visually inspected the top and bottom surfaces of the bridge.
3 Number of bridges inspected
In service | Under construction | |||
---|---|---|---|---|
Number of bridges | Extension (m) | Number of bridges | Extension (m) | |
East Nippon Expressway Co., Ltd. | 27 | About 14,000 | 29 | About 9,000 |
Central Japan Expressway Co., Ltd. | 57 | About 51,800 | 101 | About 59,500 |
West Japan Expressway Co., Ltd. | 97 | About 31,700 | 32 | About 10,800 |
total | 181 | About 97,500 | 162 | About 79,300 |
Note) The number of bridges is counted as one vertical line, and the extension is recorded separately for each vertical line.
【reference】
The following are bridges that use PE sheath to which JHS421 is applied, which was ordered for construction after April 2004. Please note that a new bridge has been confirmed at West Japan Expressway Co., Ltd.
In service | Under construction | |||
---|---|---|---|---|
Number of bridges | Extension (m) | Number of bridges | Extension (m) | |
East Nippon Expressway Co., Ltd. | 7 | About 4,300 | 25 | About 8,100 |
Central Japan Expressway Co., Ltd. | 3 | About 1,000 | 56 | About 24,300 |
West Japan Expressway Co., Ltd. | 26 | About 9,500 | 29 | About 9,900 |
Note) The number of bridges is counted as one vertical line, and the extension is recorded separately for each vertical line.