Notice of Construction Regulations on the Doto Expressway (Between Obihiro JCT and Otofuke Obihiro IC)
-Implementation of "day-night continuous one-way alternating traffic regulation"-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of Construction Regulations on the Doto Expressway (Between Obihiro JCT and Otofuke Obihiro IC)
August 27, 2007
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Sapporo Atsubetsu-ku, Regional Head Office length: Kubotera Katsuji), the Doto Expressway in between Obihiro Otofuke from Obihiro junction (JCT) Interchange (IC), the reduction of the traffic regulations of safe and comfortable passage and annual In order to achieve this, we will inform you that we will implement "day-night continuous one-sided alternating traffic control" as follows. We apologize for the inconvenience, but we appreciate your understanding and cooperation.
In case of rain, it will be postponed the next day, so please check the Japan Road Traffic Information Center, highway telephones, information boards, etc. for traffic restrictions.
1 Construction content and construction period
"Day-night continuous one-sided alternating traffic regulation"
It is a day and night continuous one-sided alternating traffic regulation for pavement repair work (frost protection work).
【section】
Obihiro JCT-Otofuke Obihiro IC
【period】
From Monday, September 10 9:00 to Saturday, September 15 6:00 (5 consecutive days)
From Tuesday, September 18 9:00 to Saturday, September 22 6:00 (4 consecutive nights)
September 25th (Tue) 9:00 to September 29th (Sat) 6:00 (4 consecutive days)
Monday, October 1 9:00 to Saturday, October 6 6:00 (5 consecutive days)
*Spare day at postponement
From Tuesday, October 9 9:00 to Saturday, October 13 6:00 (4 consecutive days)
From Monday, October 15 9:00 to Saturday, October 20 6:00 (5 consecutive days)
[Regulation extension]
The maximum length of regulation is approximately 1.4km.
There is a temporary stop on the main line and a maximum waiting time of about 5 minutes.
Please drive safely according to the information version, regulatory signs, and guidance of guides.
[Construction period calendar]

2 Information during the construction period
Information on night traffic will be provided through the following media.
(1) Internet
- For the latest regulatory information, see DraTra "Please refer to the.
- "Latest Traffic Information" is posted in "Road Traffic Information" of "Japan Road Traffic Information Center".
address【http://www.jartic.or.jp/]
(2) Flyers, posters
It is distributed and posted at each service area/parking area on the Expressway, at the tollgate office, and at the Obihiro Construction Office of the Hokkaido Regional Head Office NEXCO EAST.
(3) Telephone
- "NEXCO EAST Customer Center": We will answer various inquiries regarding Expressway 24 hours a day, 365 days a year.電話番号 0570-024-024(PHS・IP電話のお客さま:03-5338-7524)
- "Highway telephone": We provide real-time traffic information (5 minutes update) 24 hours a day.電話番号 011-896-1620(札幌) 0166-54-1620(旭川)0143-59-1620(室蘭) 0155-42-1620(帯広)(Note) Please be careful not to make a mistake.
- "Japan Road Traffic Information Center": We provide the latest traffic information.電話番号 011-891-8111(午前7時~午後7時)
(4) Road traffic information available while driving
- Road information board