Do-O Expressway Chomanbu Interchange and Toyoura Interchange
Notice of alternate traffic control on one side at night
-Construction of tunnel equipment-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Notice of alternate traffic control on one side at night between Chomanbe interchange and Toyoura interchange on the Do-O Expressway
September 17, 2008
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Sapporo City Atsubetsu-ku, Regional Head Office President: Yuki Yamamoto) has the following "One-way alternate traffic at night" to secure safe and comfortable traffic between the Do-O Expressway Chomanbe interchange (IC) and Toyoura IC. We will inform you that the construction will be done according to the regulations.
We apologize for the inconvenience and ask for your understanding and cooperation.
In case of bad weather, it will be postponed the next day, so please check the Japan Road Traffic Information Center, highway telephones, information boards, etc. for traffic restrictions.
1 Construction content and construction period
"One night alternating traffic regulation"
It is a traffic regulation on one side at night for tunnel equipment and bridge repair work.
【section】
Chomanbe IC-Toyoura IC (upper and lower lines)
【period】
Wednesday, October 1 (1 night) from 20:00 to 6:00 the next morning
[Preliminary day: October 2 (Thursday), October 3 (Friday) 20:00 to 6:00 the next morning]
- In case of bad weather, we will postpone to the above reserve day.
[Regulation extension]
The maximum regulatory extension is approximately 2.0 km.
There is a temporary stop on the main line and a maximum waiting time of about 10 minutes.
Please drive safely with information boards, regulatory signs, and guides.
"Construction period calendar"
![Wednesday, October 1 (1 night) from 20:00 to 6:00 the next morning [Spare day: Thursday, October 2 and Friday, October 3 from 20:00 to 6:00 the next morning] In case of bad weather, the above reserve Postpones to the day. Image image of](/rest/pressroom/press_release/hokkaido/h20/0917c/images/cal01.gif)
2 Information during the construction period
工事規制情報は、下記の各種媒体を通じて提供しております。
(1) Internet
- For the latest regulatory information, see DraTra "Please refer to the.
- "Latest traffic information" is posted in "Road traffic information" of "Japan Road Traffic Information Center".
address【 http://www.jartic.or.jp/ ]
(2) Flyers, posters
Expressway each service area, parking area and tollgate office of, NEXCO EAST Hokkaido Regional Head Office distributed in such Muroran management office, it has been posted.
(3) Telephone
- 『NEXCO東日本お客さまセンター』
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024(PHS・IP電話のお客さま:03-5338-7524) - 『ハイウェイテレホン』
リアルタイムの交通情報(5分更新)を24時間提供しています。
電話番号
011-896-1620(札幌)
0166-54-1620(旭川)
0143-59-1620(室蘭)
0155-42-1620(帯広)
(注)おかけ間違いのないようにご注意ください。 - 『日本道路交通情報センター』
最新の交通情報を提供しております。
電話番号
011-891-8111(午前7時~午後7時)
(4) Road traffic information available while driving
- Road information board
- Highway radio (1620kHz)