Doto Expressway between Tomamu Interchange - Tokachishimizu Interchange
Notice of alternate traffic control on one side at night
-Tunnel repair work-
- Corporate Top
- Press Room
- Press Release Hokkaido office
- Between Tomamu Interchange and Tokachi Shimizu Interchange on the Doto Expressway Notice of alternate traffic on one side at night
September 17, 2008
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo, Regional Head Office Director: Yuki Yamamoto) At Doto Expressway Tomamu Interchange (IC) to Tokachi Shimizu IC, safe and comfortable In order to secure traffic, we will inform you that the construction will be carried out according to the "night-side alternate traffic regulation" as follows.
We apologize for the inconvenience and ask for your understanding and cooperation.
In case of bad weather, we will postpone the next day (excluding Saturdays and Sundays), so please check the Japan Road Traffic Information Center, highway telephone, information board, etc. for traffic regulation status.
1 Construction content and construction period
"One night alternating traffic regulation"
It is a traffic regulation on one side at night for tunnel repair work.
【section】
Tomamu IC ~ Tokachi Shimizu IC (upper and lower lines)
【period】
September 29th (Mon)-October 3rd (Fri) (5 nights) 20:00 to 6:00 the next morning
[Preliminary days: October 6 (Monday) to October 10 (Friday) 20:00 to 6:00 the next morning]
- In case of bad weather, we will postpone to the above reserve day.
[Regulation extension]
The maximum length of regulation is approximately 3.3km.
There is a temporary stop on the main line and a maximum waiting time of about 10 minutes.
Please drive safely by following the information boards, regulatory signs, and guides.
"Construction period calendar"
![September 29th (Mon)-October 3rd (Friday) (5 nights) 20:00 to 6:00 the next morning [Preliminary day: October 6th (Mon) to October 10th (Fri) 20:00 to the next morning 6:00) ] In case of bad weather, we will postpone to the above reserve day. Image image of](/rest/pressroom/press_release/hokkaido/h20/0917d/images/cal01.gif)
2 Information during the construction period
Construction regulation information is provided through the following media.
(1) Internet
- NEXCO EAST "Regional information (Hokkaido)"
[http://www.e-nexco.co.jp/road_info/local_info/hokkaido/] - "Road Traffic Information Now! !! ] [ http://www.jartic.or.jp/ ]
(2) Flyers, posters
Expressway each service area, parking area and tollgate office of, NEXCO EAST Hokkaido Regional Head Office distributed in such as Obihiro Construction Office, it has been posted.
(3) Telephone
- 『NEXCO東日本お客さまセンター』
24時間365日、高速道路に関する様々なお問合せにお答えします。
電話番号
0570-024-024(PHS・IP電話のお客さま:03-5338-7524) - 『ハイウェイテレホン』
リアルタイムの交通情報(5分更新)を24時間提供しています。
電話番号
011-896-1620(札幌)
0166-54-1620(旭川)
0143-59-1620(室蘭)
0155-42-1620(帯広)
(注)おかけ間違いのないようにご注意ください。 - 『日本道路交通情報センター』
最新の交通情報を提供しております。
電話番号
011-891-8111(午前7時~午後7時)
(4) Road traffic information available while driving
- Road information board