Doto Expressway Ikeda Main Line Toll Gate ETC lane will be operational from Tuesday, March 31st

  • Corporate Top
  • Press Room
  • Press Release Hokkaido office
  • Doto Expressway Ikeda Main Line Toll Gate ETC lane will be operational from Tuesday, March 31st

March 18, 2009
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office

NEXCO EAST Hokkaido Regional Head Office (Sapporo City Atsubetsu-ku, Regional Head Office president: Yuki Yamamoto) is the first Ikeda Main Line toll gate ETC lane between the Doto Expressway Tomamu Interchange (IC) and Honbetsu IC / Ashoro IC, March 2009 We will inform you that the operation will start on Tuesday, March 31st.

In commemoration of the start of ETC operation this time, we will carry out a campaign to offer on-board equipment at a low price by joining with our affiliated credit card "E-NEXCO pass" at the same time.

1 Start of operation of ETC lane

(1) Operation start date and time

March 31, 2009 (Tuesday) 10:00
On that day, the operation start ceremony will be held locally.

(2) Maintenance place

Doto Expressway Ikeda Main Line Toll Gate Attachment 1 [PDF: 20KB] Please refer to)

(3) Number of maintenance

2 lanes (1 lane each for the vertical lines)

  • ETC maintenance between Tomamu IC and Ikeda IC other than the Ikeda Main Line tollgate will be provided at all tollgates when the Shimukappu IC (tentative name) to Tomamu IC is opened in FY2009.

2 Implementation of safety (speed control) measures

At all toll gate ETC lanes at NEXCO EAST, measures are being implemented in order to delay the operation of the ETC opening/closing bar from the current level in order to ensure customer safety when passing through the lane.

At the Ikeda Main Line tollgate, we will implement speed control measures by delaying the ETC opening/closing bar.

[Notes when passing through the ETC lane]

If the approach speed to the ETC lane exceeds 20 km/h, it may collide with the ETC opening/closing bar.

Please keep a sufficient distance between you and the vehicle in front of you, enter and drive at a safe speed below 20 km/h, and make sure that the ETC opening/closing bar is open before you drive.

Please drive at a safe speed below 20 km/h, and make sure that the ETC opening/closing bar is open before driving.

3 About the ETC operation start commemorative campaign implementation

(1) Date

Saturday, April 4, 2009, 5th Sunday

(2) Reception hours

From 10am to 4pm

(3) Holding place

Nagasakiya Obihiro store 2nd floor center plaza (12-3 West 4th west, Obihiro City)

(4) Outline

ETC on-board unit is available at a low price of ¥2,750 for customers who newly subscribe to “E-NEXCO pass” (advance reservations required: limited to 75 people on both days). Attachment 2 [PDF: 520KB] Please refer to)

  • Press: Information about the ceremony venue

If you are a member of the press who wants to cover the day, please come to the Ikeda Toll Parking Lot by 9:20.

Image image of map of Ikeda toll parking lot

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.