[E38] Doto Expressway 4-lane Project PR Room
"Otofuke BASE" opens
- Corporate Top
- Press Room
- Press Release Hokkaido office
- [E38] Opening of the PR room "Otofuke BASE" for Doto Expressway 4-lane expansion project
January 21, 2020
East Nippon Expressway Co., Ltd.
Hokkaido Regional Head Office
NEXCO EAST Hokkaido Regional Head Office (Atsubetsu-ku, Sapporo) will open a PR room called "Otofuke BASE" with the aim of promoting understanding of the ongoing E38 Doto Expressway (Doto Expressway) four-lane widening project and informing people about the progress of the construction work.
1. name
Doto Expressway 4-lane Project PR Room "Otofuke BASE"
- We named it "Otofuke BASE" with the intention that it will become familiar to local residents and serve as a base for disseminating information about Doto Expressway four-lane expansion project.
2. location
Located on the north side of Otofuke Roadside Station, within Natsuzora Park grounds (next to the intercity bus and airport shuttle bus stop)
3-1 Natsuzora, Otofuke-cho, Kato-gun, Hokkaido
3. Start using
Opening on Friday, January 30, 2026
- Available hours: 9:30-17:00 (Closed during the New Year holidays)
It is available on the business days of Otofuke Roadside Station.
Four. Admission fee
free
5. Exhibition contents
| exhibit | Content | |
|---|---|---|
| ① | Business introduction panel | Explaining the outline of Doto Expressway four-lane expansion project |
| ② | Maintenance Effects Panel | An easy-to-understand explanation of the effects of widening the road to four lanes |
| ③ | 3D map model (diorama) | A 3D map model of the four-lane project area is displayed |
| ④ | Small models (bridges and tunnels) | Small models of bridges and tunnels to be constructed are on display |
| ⑤ | Timeline Panel | Introducing the history of Doto Expressway in chronological order |
| ⑥ | Photography sign | A panel imitating Expressway sign was installed for commemorative photos. |
- The exhibits will be updated as the construction progresses.
reference
exhibit
①Business introduction panel
② Maintenance effect panel
3. 3D map model (diorama)
④Small scale models (bridges and tunnels)
⑤Chronology panel
⑥Photo sign
Location map
Detail view
exterior
お知らせ 道東自動車道4車線化事業PRルーム『占冠BASE』
北海道勇払郡占冠村の占冠村物産館1階(JR占冠駅 横)に、『おとふけBASE』と同様に、PRルーム『占冠BASE』を開設しています。
事業紹介・整備効果を説明するパネル、年表パネルや撮影看板を設置しています。
お近くへお越しの際は、ぜひお立ち寄りください。
-
name
Doto Expressway 4-lane Project PR Room "Shimukappu BASE"
-
location
Shimukappu Village Products Center, 1st floor
Shimukappu Village, Shimukappu District, Hokkaido (next to JR Shimukappu Station) -
Utilization time
9:00-17:00 (Closed on Sundays)
- Same business hours as Shimukappu Village Products Center
-
Admission fee
free
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
Related Sites and Content
If you are looking for information on fares, routes, service areas and parking areas, please click here.
If you are looking for real-time traffic congestion and restriction information, click here.
NEXCO EAST (Road Disaster Prevention Information) Official X
Click here if you are looking for road information such as road closures during disasters.