Lane regulation on the Kan-Etsu Expressway (Nerima IC-Shinza Main Line Toll Gate)

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Lane regulation on the Kan-Etsu Expressway (Nerima IC-Shinza Main Line Toll Gate)

October 14, 2005
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

East Nippon Expressway Co., Ltd. Kanto Regional Head Office is working to repair Oizumi viaduct between Kan-Etsu Expressway Nerima Interchange (IC) and Niiza Main Line Toll Gate to provide better Expressway. Do the following:

With the implementation of this construction, two lanes will be regulated at night, so one lane will be used during construction. Please check the traffic information and regulations on the website in advance, and make sure you have enough time to go out.

We apologize for any inconvenience caused to our customers and local residents, and we ask for your understanding and cooperation.

1 Lane Regulation Overview

  • (1) District
    Upper and lower lines between the Kan-Etsu Expressway Nerima IC and Shinza Main Line Toll Gate
  • (2) Content
    2-lane regulation at night (upper and lower lines)
  • (3) Date and time
    [Out-bound line]
    From Monday, November 7, 2005 to Thursday, November 17 (excluding Friday, Saturday, and Sunday)
    From 18:00 to 6:00 the next morning (12 hours)
    [In-bound line]
    From Monday, November 28, 2005 to Thursday, December 8 (except Friday, Saturday, and Sunday)
    From 18:00 to 6:00 the next morning (12 hours)
  • The period may be extended depending on the progress of construction due to stormy weather.

2 Construction outline and features

  • In this repair work for the Oizumi Viaduct, joints are replaced and removed to improve the roadside environment (reduce noise and vibration) and improve running performance.
  • In this work, it is necessary to carry out the work from "pavement removal, floor slab hangers, expansion device removal, concrete placing, curing, pavement restoration" in succession. In addition, because the roadside of the construction site is in the residential area, the working hours are set so that the "floor hangers" that generate construction noise do not occur at midnight.

3 Congestion forecast associated with construction

During the construction period, from 18:00 to 23:00 when traffic volume is high, it is expected that congestion will occur on the In-bound line up to about 3 km and on the Out-bound line up to about 2 km.

4 Other construction details inquiry

 東日本高速道路株式会社 所沢管理事務所
 04-2944-4111<代表> 平日 9:00~17:30
 ホームページのアドレス: http://www.e-nexco.co.jp

The flyer This [PDF: 31KB]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.