A part of the Third Ring Road has been opened and traffic conditions have improved significantly (preliminary report)

= Improvement effect of Gaikan Expressway (Misato JCT-Misato Minami IC) =

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • A part of the Third Ring Road has been opened and traffic conditions have improved significantly (preliminary report)
3 ring image image

On Sunday, November 27, 2005, the 4.1km extension of the Gaikan Expressway (Misato JCT-Misato Minami IC) was opened. We have compiled a summary of the survey results regarding traffic conditions (preliminary figures) one week after opening, and we will report this.

According to the results of the survey, traffic conditions have improved significantly, including the elimination of the congestion on the main line at the Outer Ring Misato West (exit).

The main line congestion at the outer ring Misato West (exit) has been resolved

Shortening the time required!

Improved traffic conditions on surrounding roads!

Location map

Image of position map
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.