Chiba-Togane Road (Togane IC-Matsuo Yokoshiba IC) will be closed at night.

-New toll booth and new lamp will open when traffic is closed-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Chiba-Togane Road (Togane IC-Matsuo Yokoshiba IC) will be closed at night

March 2, 2006
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

East Nippon Expressway Co., Ltd. Kanto Regional Head Office (Location: Regional Head Office, Taito-ku, Tokyo Director: Hirozo Saeki) Chiba-Togane Road Togane Interchange (IC)-Matsuo (Matsu) O) Before the connection with the Choshi connecting road under construction (near the Matsuo Yokoshiba IC) between the Yokoshiba interchanges (ICs), a nighttime traffic closure was carried out to install a new lamp on the service main line. I will.

In addition, a new lamp will be opened at the same time as the night traffic closure is released, and the Matsuo Yokoshiba IC tollgate currently in service will be switched to the new tollgate, and along with that, the entrance and exit from Prefectural Road 62 will also move to the south side (Hasunuma side).

1 closed section and date and time

Section: Chiba-Togane Road Togane IC-Matsuo Yokoshiba IC vertical line
(Extension 16.1km)
Date and time: Wednesday, March 15, 2006 19:00 to 6:00 the next morning (11 hours)
In case of stormy weather, it will be postponed to the next day.

2 Opening date

Thursday, March 16, 2006, open at 6 am

3 Construction overview

Prior to connecting the Choshi connecting road under construction (Chiba Prefectural Road Corporation) and the Chiba-Togane Road, a lane marking, thin layer paving (slip resistant pavement) was used to install a new lamp on the main line near the Matsuo Yokoshiba IC on the Chiba-Togane Road) We will install protective fences, signs, and electrical equipment.

Along with this, in order to minimize the impact on customers by implementing the work in a concentrated and efficient manner, we decided to close the road during the night on weekdays when traffic is light.

Main work contents
At the new lamp installation part on the main line near Matsuo Yokoshiba IC, we will install lane markings, thin layer paving (slip resistant paving) protection fences, signs, and electrical equipment.

Image image of things related to Choshi connecting road

4 detour

There is a route that bypasses general national highway 126 when you use the relevant section at the time of suspension of traffic.

The travel time between Togane IC and Matsuo Yokoshiba IC is about 14 minutes, but when using the detour route, the travel time is about 23 minutes.

Detour status map

Image of detour status map

Click the image to open a PDF file. [PDF: 233KB]

About road closure information

(1) Information on traffic closures
  • Present posters, notice signs, banners, etc., and leaflets at each toll booth, service area (SA), etc.
  • Information is also provided on the East Japan Expressway website.
    East Japan Expressway Co., Ltd. http://www.e-nexco.co.jp

(2) Road traffic information that can be obtained before going out

  • ハイウェイテレホン(5分毎に最新情報を24時間提供)
    千葉局(東京湾アクアライン・館山道・東関東道・千葉東金道路・京葉道路)
    043-257-1620
    • It will be offered 10 days before the closing day.
  • ハイウェイFAX(5分毎に最新情報を24時間提供)
    ナビダイヤル FAX 0570-00-1625
    • Connect to the nearest highway fax relay station from anywhere in the country (excluding Hokkaido and Okinawa).
      (Not available from mobile communications such as car phones and mobile phones)
  • 日本道路交通情報センターの道路交通情報
    電話番号全国統一番号 0570-01-1011
    全国・関東甲信越情報 03-3264-1331
    • Connect to your nearest information center from anywhere in Japan.
      (Not available from mobile communications such as car phones and mobile phones)

(3) Road traffic information available while driving

  • Variable road information board
  • Highway radio (1620kHz)
  • VICS (You can get road traffic information with a VICS-compatible car navigation system.)

6 Other

In case of stormy weather, the decision on whether or not to close at night will be made at 3:00 pm on the day of the implementation.
Inquiries regarding implementation decisions will be handled by the office below.

  関東支社 千葉工事事務所 TEL.043-350-3321(代表)
  関東支社 市原管理事務所 TEL.0436-21-0091(代表)

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.