About implementation of all-day lane regulation work on the Gaikan Expressway

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • About implementation of all-day lane regulation work on the Gaikan Expressway

October 11, 2006
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo, Regional Head Office length: Hirozo Saeki), the Gaikan Expressway (outer loop Soka Interchange (IC) ~ outside the ring Misato in the West IC), throughout the day in order to implement the bridge reinforcement work lane We will regulate. We apologize for any inconvenience caused during construction regulations, but we appreciate your understanding and cooperation.

This construction was completed early in the morning of November 15th.
Thank you for your cooperation.

1. All-day lane regulation work section and date and time

(1) Section
Gaikan Expressway (outer) Soka IC to Outer Ring Misato Nishi IC
Lane regulation extension: 1.9km
(2) Date and time
From Monday, November 6, 2006 20:00 to Thursday, November 16, 2006 6:00
Construction will be carried out on Saturdays and Sundays.

Image image of all-day lane regulation work section and date and time

2. Construction overview

We will carry out bridge reinforcement work to improve durability, such as laying a waterproof layer on the deck of the bridge.

Image image of construction outline

3. Outline of lane regulation

Since it will take a long time to carry out this bridge reinforcement work, we will implement lane regulation all day (day and night).

In order to reduce traffic congestion as much as possible, the lane width will be reduced so that two lanes can be used during the day and one lane at night when traffic is reduced. During the construction period, the lane width will be narrow, so please follow the speed regulation, pay close attention to the distance between vehicles, and drive safely.

Image image of lane regulation outline

4. Construction details inquiry

NEXCO EAST Co., Ltd. Kanto Regional Head Office Misato Management Office

 TEL.048-952-8561(代表)
 (受付時間 / 平日9:00~17:20)
 ※但し、工事期間中は随時受付いたします

Attachment (about public relations and information provision) [PDF]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。