Request for detour due to nighttime construction

~Yokohama-Shindo Road We will carry out nighttime construction on the connecting road of Hodogaya IC~

p
  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Request for detour due to nighttime construction

October 5, 2007
East Nippon Expressway Co., Ltd.
Keihin Administration Office

Yokohama-Shindo Road Hodogaya IC Lamp Night construction has been completed.
It will be available as usual from November 14, 2007. Thank you for your cooperation.

NEXCO EAST Keihin Management Office (Tsuzuki-ku, Yokohama, Director: Jun Maekawa) Highway Kanagawa No. 2 Mitsuzawa Line connecting route of the Yokohama-Shindo Road Hodogaya Interchange In order to carry out nighttime construction, we will implement detour restrictions during the construction period.

We apologize for any inconvenience caused during the construction period, and we appreciate your understanding and cooperation.

1 Construction section and date and time

(1) Section
Yokohama-Shindo Road Hodogaya IC C lamp

  • Connecting route from the Yokohama-Shindo Road (In-bound line) to the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line
    See Attachment-1 [PDF:846KB]

(2) Date and time

period:
From Monday, November 5, 2007 to Friday, November 9, 2007
From Monday, November 12, 2007 to Friday, November 16, 2007

time:
From 21:00 every night to 5:30 the next morning (8 hours 30 minutes)

Calendar: From 5pm to 9pm every night from 5pm to 5:30am the following morning, from 12pm to 16pm every night from 11pm to 5:30am the next morning

  • In order to ensure the advance preparation and traffic safety, in each work day, from 19 pm Yokohama-Shindo Road In-bound make the lane restrictions in the line-to-line new Hodogaya IC ~ Hodogaya IC.
  • Due to stormy weather, the date when the detour regulation ends may change.

2 Detour

See Attachment-1 [PDF:846KB]

(1) Detour route 1 [wide area detour route]

Customers using the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line from the Yokohama-Shindo Road Totsuka/Kawakami/Imai area, the Yokohama Yokosuka Road, and the Hodogaya Bypass from the Hodogaya IC will use the Kariba IC from the Shin-Hodogaya IC. Please make a detour to the Kanagawa No. 3 Kariba Line on the Shuto Expressway.

(2) Detour route 2 [nearest detour route]

Yokohama-Shindo Road From Hodogaya IC, use National Road No. 1 exit ramp, turn right at National Road No. 1 to Mitsuzawa Uemachi intersection, go through Shin-Yokohama-dori, and use the Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line Mitsuzawa entrance (( Detour usually takes about 5 minutes). There is no additional charge for the detour.

In addition, during the nighttime construction period, due to the detour of (2) above, from around 22:00 to 22:00 before and after the start of the ramp, from the Yokohama-Shindo Road In-bound line to the "Tokyo Metropolitan Expressway Kanagawa No. 2 Mitsuzawa Line / Daisan-Keihin Road Tokyo area" We predict a traffic jam of about 1km, starting from the junction of Hodogaya IC at the "Route 1 Exit".

For information on how to obtain road traffic information, please refer to ( Attachment-3 [PDF:140KB] .

2 Construction overview

We will repair bridge decks and pavements for Hodogaya IC connecting roads.

See Attachment 2 [PDF:207KB]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。