Keiyo Road (between Shinozaki and Ichikawa IC: Out-bound line) Change of driving lane to detour road

~Congestion is expected due to lane regulation work~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Keiyo Road (between Shinozaki and Ichikawa IC: Out-bound line) Change of driving lane to detour road

October 8, 2009
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo, Regional Head Office length: Shinichi Ishikawa), the Gaikan Expressway and Keiyo Road due to the construction of Keiyo junction and is connected (JCT) (tentative name), Keiyo Road established a bypass road in In order to do so, we are carrying out construction to change the driving lane.

With this construction, we will inform you that the lanes for the detour road to be installed will be gradually changed for the Out-bound line between the Shinozaki entrance of the Keiyo Road and the Ichikawa Interchange (IC).

When changing lanes, there are times when traffic congestion is expected due to the decrease in the number of lanes due to lane restrictions, so when you go out, please allow yourself some time and go to the parallel Higashi-Kanto Expressway. Please use detours (See Attachment 1 [PDF: 30KB]) and public transportation.

We apologize for the inconvenience, and we appreciate your understanding and cooperation.

The change of lanes to the In-bound detour road is planned to be implemented in the middle of November. At that time, traffic congestion is expected as the number of lanes decreases due to lane restrictions. Details will be announced later in early November.

1 Out-bound summary of the changes the driving lane to the bypass road of the line

We will carry out in stages according to the following schedule. (See Attachment 2 [PDF:701KB])

(1)
Tuesday, October 13th, around 4am: Change the exit of Ichikawa IC from Tokyo.
The position of the Ichikawa IC exit "I will move about 300m closer to Tokyo" Please be careful.
(2)
Under the day and night continuous regulation from October 20th (Tue) to October 25th (Sun) (including preliminary days), the Out-bound line will be changed to the detour road.
Wednesday, October 21, around 4 am: We are planning to change the driving lane to the bypass road.
  • In both cases, if the weather is bad, we will change it after the next day.

2 Traffic regulation due to change of driving lane to detour road

During the following period, the number of lanes that can be driven will be reduced to 2 lanes during the day and 1 lane at night.

  • Daytime: 5:00~22:00, Nighttime: 22:00~5:00

 Period: Tuesday, October 20, 2009-Sunday, October 25, 2009 (including preliminary days)

Along with this, congestion is expected.
The expected time of day and the length of traffic jam on each day are as follows.

  • The length of traffic congestion is expected in consideration of the detours to the parallel East Kan-do route.
Image of traffic congestion prediction in Keiyo Road switching construction

Also, from the Shinozaki entrance to Route 14, it is expected that there will be traffic congestion due to the traffic congestion on the Keiyo Road main line.

3 How to obtain road traffic information

(1) Information on day-night continuous control work

  • We will post and distribute posters, standing signs and leaflets in the service area (SA), parking area (PA), etc.
  • A banner will be posted on the overpass such as Expressway and national highways.
  • This press release material will be posted on our website.
  • NEXCO EAST Customer Center is also available.
    ナビダイヤル 0570-024-024(24時間対応)
    (PHS、IP電話のお客さま 03-5338-7524

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while driving

  • Variable road information version
  • Highway radio (AM1620kHz)
  • Highway Information Terminal (Status information will be announced on the TV screen in an easy-to-understand manner.)

    Makuhari PA (above), Shisui PA (above), Ichihara SA (above), Wangan Makuhari PA (above)

  • VICS (You can get road traffic information with a VICS-compatible car navigation system.)

Construction contents during the detour period (Attachment 3) [PDF: 300KB]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.