Higashi-Kanto Expressway Ibaraki Airport North IC-Ibaraki Town JCT Notice of traffic closure and alternate traffic regulation on one side

Closed from September 24th, 5pm to September 29th, 6pm
Alternate traffic regulation on one side September 18th from 6:00 to September 21st 18:00
~Reconstruction work for roads damaged by the Great East Japan Earthquake~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Higashi-Kanto Expressway Ibaraki Airport North IC-Ibaraki Town JCT Notice of traffic closure and alternate traffic regulation on one side

September 11, 2012
East Nippon Expressway Co., Ltd.
Mito Management Office

NEXCO EAST Mito Management Office (Mito City, Ibaraki Prefecture) will carry out restoration work on roads damaged by the Great East Japan Earthquake between the Higashi-Kanto Expressway Ibaraki Airport North Interchange (IC) and Ibaraki Town Junction (JCT). This restoration work will be closed from 5:00 on September 24 to 6:00 on September 29. In addition, before the road is closed to the public, one-sided alternate traffic control will be applied within the same section.

We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you will have plenty of time when you go out.

1 Closed traffic and one side alternate traffic regulation section and date and time

  • (1) Closed section
    Higashi-Kanto Expressway Ibaraki Airport North IC-Ibarakicho JCT (upper and lower lines) Extension 8.8km
  • (2) Alternating traffic control section on one side
    Higashi-Kanto Expressway Ibaraki Airport North IC-Ibarakicho JCT About 1km section
Image image of closed section
  • (3) Closing date and alternate traffic regulation date and time
    Higashi-Kanto Expressway Ibaraki Airport North IC-Ibarakicho JCT (upper and lower lines) Extension 8.8km
Image image of the date and time when traffic is closed and one side is closed
  • The road will be closed even in bad weather.
  • In case of stormy weather, the start time and end time of the one-sided alternate traffic regulation will be postponed.
  • The maximum waiting time during one-sided alternate traffic regulation is about 5 minutes.
  • Please drive safely by following the information boards, regulatory signs, and guides.

2 Detour

If you use the Expressway during the closed period, please use the nearby Joban Expressway Iwama IC, Kita Kanto Automatic Road Ibarakicho Nishi IC or Ibarakicho Higashi IC. (Attachment-1 [PDF:124KB] reference)

3 Construction overview

We will repair the road body damaged by the Great East Japan Earthquake (pavement damage, bridge damage). In order to carry out this restoration work, a five-day suspension of traffic and two-way traffic regulation on one side are required twice.

Regarding the second implementation, we will inform you separately when the schedule is decided.

We ask for your understanding and cooperation so that our customers can use our products safely and comfortably.

4 How to obtain road closure information

(1) Information on traffic closures

  • NEXCO東日本お客さまセンターでご案内いたします。
    ナビダイヤル 0570-024-024(24時間対応)
    (PHS、IP電話のお客さま 03-5338-7524

(2) Road traffic information that can be obtained before going out

(3) Traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    It can be obtained from VICS-compatible car navigation systems.
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。