Joshin-Etsu Expressway (Out-bound line) Between Matsuida Myoyoshi IC and Saku IC
Notice of traffic closure at night (4 nights)

From Tuesday, June 25, 26th (Wed), July 2 (Tue), 3rd (Wed) 20:00 to 6:00 the next morning

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Joshin-Etsu Expressway (Out-bound Line) Matsuida Myoyoshi IC-Saku IC Night Closure Notice (4 nights)

May 29, 2013
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo) removed tunnel ceiling board (steel duct) and repaired road at Joshin-Etsu Expressway (Joshinetsu Expressway) Matsuida Myoyoshi Interchange (IC)-Saku IC (Out-bound) Due to such reasons, the traffic will be closed at night (4 nights) from 20 o'clock on June 25 (Tuesday), 26th (Wednesday), 2nd July (Tuesday) and 3rd (Wednesday) until 6:00 the next morning. I will carry it out.

We would like to ask for your understanding and cooperation regarding night traffic.

1 Night closed sections, etc.

(1) Section, etc.: Joshinetsu Expressway (Out-bound line) Between Matsuida Myoyoshi IC and Saku IC (extension 33.9km)

[Main work contents] Image image of Happuyama tunnel ceiling plate (steel duct) removal work, road repair work, etc.

(2) Date and time: June 25, 2013 (Tuesday), 26th (Wednesday) and July 2, 2013 (Tuesday), 3rd (Wednesday) From 20:00 to 6:00 (10 hours) the next morning

Image of date and time
  • In case of stormy weather, it will be postponed to the same time zone from the next day. In addition, the decision to carry out night traffic will be made at 14:00 on the day of implementation.

2 Detour

Please use Route 18 and Route 254 as a detour.

Joshinetsu Expressway It takes about 33 minutes between Matsuida Myogi IC and Komoro IC, and about 43 minutes if you take a detour on Route 18. Also, it usually takes about 40 minutes between the Joshinetsu Expressway Shimonita IC and the Chubu Crossing Sakunan IC, and about 63 minutes if you detour on Route 254. The time required will be 10 to 25 minutes longer, so please take time to go out.

Regarding the transfer charge adjustment due to suspension of traffic Attachment 1 [PDF: 63KB] Please refer to the.

3 How to obtain traffic information

(1) Public information regarding suspension of traffic

  • We will post and distribute posters, notice signs and leaflets in the service area (SA), parking area (PA), etc.
  • We will inform you by radio CM.
  • Post banners on the Kan-Etsu Expressway, Joshinetsu Expressway, Kita Kanto Expressway, Ken-O Road O Expressway, and overpass bridges for general roads.

(2) Traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    It can be obtained from VICS-compatible car navigation systems.
  • Highway Information Terminal
    Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.