Tateyama Expressway Kimitsu IC ~ Futtsu-Tateyama Road Tomiura IC between nighttime road closures Announcement

Monday, November 9th to Friday, November 13th, every night from 21:00 to 5am
~4 lane construction work (switching Futtsu Takeoka IC In-bound line lamps, setting rock fall protection fences, etc.), pavement repair work, equipment inspection/cleaning in tunnels~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • Tateyama Expressway Kimitsu IC ~ Futtsu-Tateyama Road Tomiura IC between nighttime road closures Announcement

October 26, 2015
East Nippon Expressway Co., Ltd.
Tokyo Wan Aqua-Line Expressway Management Office
Kisarazu Construction Office

(Added on November 18, 2015)
Today (November 18), I was planning from 21:00 pm to 5:00 pm the next morning,
Tateyama Expressway Kimitsu IC-Futtsu-Tateyama Road Tomiura IC closed at nightAs for,, due to stormy weather, it was postponed at the same time on Thursday, November 19. We apologize for the inconvenience and ask for your understanding and cooperation.
(Added on November 17, 2015)
Today (November 17th), I was planning from 21:00 pm to 5 am the next day,
Tateyama Expressway Kimitsu IC-Futtsu-Tateyama Road Tomiura IC closed at nightAs for, due to stormy weather, we postponed it at the same time on Wednesday, November 18. We apologize for the inconvenience and ask for your understanding and cooperation.
(Added on November 13, 2015)
Today (November 13th), I was planning from 21:00 pm to 5 am the next day,
Tateyama Expressway Kimitsu IC-Futtsu-Tateyama Road Tomiura IC closed at nightDue to stormy weather, it was postponed at the same time on Monday, November 16th. We apologize for the inconvenience and ask for your understanding and cooperation.
(Added on November 10, 2015)
Today (November 10th), I was planning from 21:00 pm to 5 am the next morning,
Tateyama Expressway Kimitsu IC-Futtsu-Tateyama Road Tomiura IC closed at nightAs for,, due to stormy weather, we postponed it at the same time on Wednesday, November 11. We apologize for the inconvenience and ask for your understanding and cooperation.

NEXCO EAST Tokyo Wan Aqua-Line Expressway Management Office and Kisarazu Construction Office (Kisarazu City, Chiba Prefecture) have four-lane construction (Futtsu Takeoka IC In-bound Line Lamp) between the Tateyama Expressway Kimitsu Interchange (IC) and Futtsu-Tateyama Road Tomiura IC. Switching, and installation of rockfall protection fences etc. for safety measures during construction), pavement repair work, and inspection and cleaning work of tunnel equipment. Along with this, from November 9th (Monday) to November 13th (Friday) every night from 21:00 to 5:00 the next morning, we will be closed at night in the same section.

We apologize for the inconvenience, but we kindly ask for your understanding and cooperation so that you may have some time when you go out.

1 closed section and date and time

(1) Closed section

An up and down line between the Tateyama Expressway Kimitsu IC and Futtsu Takeoka IC (extension 16.7km)
Futtsu-Tateyama Road Futtsu Takeoka IC-Tomiura IC vertical line (extension 19.2km) Total 35.9km

Image image of closed section

(2) Closing date and time

Monday, November 9, 2015, 10th Tuesday, 11th Wednesday, 12th Thursday, 13th Friday
<Preliminary day> 16th (Mon), 17th (Tue), 18th (Wed), 19th (Thurs), 20th (Fri)
Every night from 21:00 to 5:00 the next morning (8 hours per day)
  • Tateyama Expressway Kimitsu Parking Area and Futtsu-Tateyama Road Highway Oasis Furakuri (Roadside Station Furakuri Tomiyama) until 20:30.
Image of closed days
  • In case of stormy weather, the work will be postponed.
  • In case of stormy weather, the decision to stop at night will be made at 16:00 pm on the day of the implementation.
  • For the latest information, see NEXCO EAST Road Information Site "DraTra" etc. [4.(2) Road traffic information available before going out] Please confirm.

 当日の実施判断など、お出かけ前の情報入手につきましては、NEXCO東日本 お客さまセンター(TEL:0570-024-024)、日本道路交通情報センター(TEL:050-3369-6666)などからご確認いただけます。

2 Detour

The detour route between the Tateyama Expressway Kimitsu IC and Futtsu-Tateyama Road Tomiura IC is Route 127. The time between the Kimitsu IC and Tomiura IC (about 36km) is usually about 30 minutes, but if you use the detour route, the time will be about 70 minutes, so please take time to go. Attachment [PDF: 159KB]

Image of detour

3 Construction overview

[Construction of 4 lanes on Tateyama Road]

As part of the four-lane construction work on the Tateyama Road (Kimitsu-Futtsu Takeoka), we will carry out switching work to relocate the Futtsu Takeoka IC In-bound ramp to a position closer to the main line than it is now for cutting construction. In addition, as a safety measure for the service line, we will install in advance a rock fall protection fence during cutting work and a temporary guardrail and blindfold net to separate the service line from the construction site.

  • Futtsu Takeoka IC In-bound ramp switching work
    For cutting construction near Futtsu Takeoka IC, the In-bound ramp of Futtsu Takeoka IC (a ramp to join the In-bound line towards Kimitsu IC) will be moved to a position closer to the main line than it is now.
Image of Futtsu Takeoka IC In-bound ramp switching work
  • Rockfall protection fence and temporary guardrail installation work
    We will install rockfall protection fences and temporary guardrails as a safety measure for the service lines that accompany 4-lane construction.
Image image of setting of rockfall guard fence
Installation of rockfall protection fence
Image of temporary guardrail installation
Installation of temporary guardrail

[Tateyama Road/Futtsu Tateyama Road Maintenance Repair Work]

We will repair damaged pavements and inspect, clean and repair emergency equipment in tunnels.

  • Road maintenance work
    We will improve the runnability and safety by improving the damaged parts on the pavement and improving the road markings (lane marks).
Image image of pavement repair
Pavement repair
Image image of installation of road marking
Installation of road marking
  • Facility maintenance work
    We will inspect and clean the tunnel lighting and emergency equipment to keep them in good condition at all times.
Image of cleaning and inspection of tunnel lighting equipment
Tunnel lighting equipment cleaning and inspection
Image of emergency equipment cleaning and inspection
Emergency equipment cleaning and inspection

In carrying out these works, in order to minimize the impact on our customers, we will close the roads during the nights on weekdays when traffic is light, and will carry out the work intensively and efficiently. We ask for your understanding and cooperation so that our customers can use the Expressway safely and comfortably.

4 How to obtain traffic information

(1) Public information regarding suspension of traffic

  • We post a construction notice signboard at the toll booth.
  • Post banners on overpass bridges on Expressway.

(2) Traffic information that can be obtained before going out

  • NEXCO東日本お客さまセンター
    ナビダイヤル:0570-024-024 (24時間オペレーターが対応)
    TEL:03-5338-7524 (PHS、IP電話のお客さま)
  • NEXCO EAST Road Traffic Information Site "DraTra "
    [PC] http://www.drivetraffic.jp/
    [Mobile] http://m.drivetraffic.jp/
  • For the latest regulatory information, see DraTra "Please refer to the.
  • 日本道路交通情報センター(JARTIC)の道路交通情報
    全国共通ダイヤル 050-3369-6666(携帯電話短縮ダイヤル#8011
    全国・関東甲信越情報 050-3369-6600
    千葉情報 050-3369-6612
    ホームページ【PC】
  • ハイウェイテレホン(5分毎に更新される最新情報を24時間提供)
    千葉局 043-257-1620(携帯電話・PHS短縮ダイヤル#8162
(3) Traffic information available while using the Expressway
  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    It can be obtained from VICS compatible car navigation systems.
  • Highway Information Terminal
    Wide area road information is provided in an easy-to-understand manner on the monitor screens installed in SA/PA.
    Higashi-Kanto Expressway Wangan Makuhari PA (upper and lower), Shisui PA (upper and lower)
    Tateyama Expressway Ichihara SA (up and down)
    Keiyo Road Makuhari PA (upper and lower)
    Chiba-Togane Road Noro PA (above)
    Tokyo Wan Aqua-Line Expressway Umihotaru PA

* Twitter's official account "NEXCO EAST (Kanto)" (@e_nexco_kanto ) Also distributes information.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.