[C3] Gaikan Expressway (outside) Misato From JCT [E6] Joban Expressway A dedicated lamp * (first lamp) will open on Wednesday, April 11, 2018 at 22:00. To do

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C3] Gaikan Expressway (outside) Misato From JCT [E6] Joban Expressway A dedicated lamp * (first lamp) will open on Wednesday, April 11, 2018 at 22:00. To do

March 14, 2018
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Branch (Saitama Prefecture Saitama City)C3 Gaikan Expressway (hereinafter “outer ring road”) Misato From the outer ring road (outer loop) that has been improved as a measure against traffic congestion at the junction (hereinafter “JCT”) E6The exclusive lamp connecting to Joban Expressway (hereinafter "Joban way") will be opened on April 11 (Wed), 2018

The opening will ease the congestion of lamps from the outer ring road (outer ring) to the Joban Expressway, allowing you to pass smoothly (for business outline and usage method, Attachment [PDF: 929KB] Please refer to the).

Opening date and time

April 11 (Wed), 2018 22: 00

Open section

A dedicated ramp (name: No. 1 ramp) from the outer ring road (outer circumference) of the Misato JCT to the Joban Expressway (Out-bound)

Number of lanes

1 lane

Opening extension

About 1,600m

Location map

Image of position map of current lamp (first lamp) and current lamp (second lamp)
  • Ramp is a road that connects the two. As junction Expressway and Expressway in locations intersect or approach, the connection path that is sterically connected so these road called lamp.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.