[E83] Yokohama-Shindo Road Fujitsuka IC Exit Lamp Night Closure Notice

Wednesday, November 4th, from 20:00 to 5:00 the next morning
~ Repair work for damaged pavement ~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Fujitsuka IC Exit Lamp Night Closure Notice

The latest regulatory information isDraTraPlease see.

October 12, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture) will be closed at night for pavement repair work at the exit ramp of the E83 Yokohama-Shindo Road Out-bound Line Fujitsuka Interchange (hereinafter "IC"). ..
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

(1) Closed location: Yokohama-Shindo Road (Out-bound line) Exit ramp that flows out from Fujitsuka IC to general roads

Closed location: Yokohama-Shindo Road (Out-bound line) Image of exit ramp flowing out from Fujitsuka IC to general road
  • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time

Implementation date:
2020 Wednesday, November 4th, 20:00 to 5:00 the next morning
Preparation day:
November 5th (Thursday), 9th (Monday), 10th (Tuesday), 2020 20:00 to 5:00 the next morning
Image of date and time
Image of QR code
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the figure below for the detour.
If you detour to the Yokohama-Shindo Road In-bound Line Fujitsuka IC as shown in the figure below, it will take about 6 minutes (usually about 1 minute).
The detour will take longer, so please leave plenty of time.

Image of detour

3. Construction overview

Yokohama-Shindo Road The pavement repair work will be carried out because the pavement road surface is damaged at the Fujitsuka IC exit ramp.
The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations, so it is necessary to close the lamp and carry out the work. Therefore, in order not to cause any inconvenience to customers, we will close the lamps on weekday nights when there is little traffic, and carry out the construction intensively and efficiently. This work is necessary to use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Outline of construction Photograph of pavement damage
Outline of construction Pavement repair work Photograph of work status

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway information terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA/PA.
  • VICS
    Road traffic information can be obtained from VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.