[E83] Yokohama-Shindo Road Kawakami IC entrance ramp night closure notice

September 12th (Monday) and 13th (Tuesday) from 22:00 to 5:00 the next morning
-Pavement repair work and countermeasure work for reverse driving-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Kawakami IC entrance ramp night closure notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 479KB]

August 29, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

At the NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), the entrance ramp of the E83 Yokohama-Shindo Road Kawakami Interchange (hereinafter referred to as "IC") will be closed at night to carry out pavement repair work and countermeasures against reverse driving.
We apologize for the inconvenience, but we ask for your understanding and cooperation so that you have plenty of time when you go out.

1. 1. Closing location and date and time

  1. Closed location: Yokohama-Shindo Road Upper and Lower Line Kawakami IC entrance ramp
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    September 12 (Mon) and 13 (Tue), 2022
    Every day from 22:00 to 5:00 the next morning
    Preparation day:
    September 14th (Wednesday) and 15th (Thursday), 2020
    Every day from 22:00 to 5:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Refer to the figure below for detours.

  • If you detour from Kawakami IC to Imai IC on the Yokohama-Shindo Road In-bound Line as shown by the blue arrow in the diagram below, it will take about 7 minutes (usually about 4 minutes).
  • If you detour from Kawakami IC to Totsuka Out-bound on the Yokohama-Shindo Road Outbound Line as indicated by the pink arrow in the figure below, it will take about 11 minutes (usually about 2 minutes).

Detours will increase the time required, so please take time to go out.

Image of detour

3. Construction overview

At the entrance ramp of Yokohama-Shindo Road Kawakami IC, the paved road surface is damaged, so we will carry out road surface repair work and reverse driving countermeasure construction (road marking, color pavement) to prevent reverse driving accidents on Expressway.
The section where this work will be carried out is a single lane, and since construction cannot be carried out under normal lane restrictions, it is necessary to work with the ramp closed. In order to minimize inconvenience to customers, the ramp will be closed at night on weekdays when traffic is light, and construction will be carried out intensively and efficiently. We ask for your understanding and cooperation as this work is necessary for safe and comfortable use of the Expressway.

Image image of paved road surface damage situation
Image image of reverse-way driving countermeasure example

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.