[C4] Ken-o Expressway and outer loop, between Goka IC and Tsukuba Ushiku IC
Nighttime road closure notice

~Conducting construction work related to the widening of Ken-O Road four lanes and carrying out repairs and inspections of road structures~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C4] Notice of nighttime road closure on the inner and outer loop Ken-o Expressway between Goka IC and Tsukuba Ushiku IC

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 2.8MB]

August 1, 2020
East Nippon Expressway Co., Ltd.
Saitama Construction Office
Kazo Management Office
Tsukuba Construction Office

NEXCO EAST Saitama Construction Office (Saitama City, Saitama Prefecture), Kazo Management Office (Kazo City, Saitama Prefecture), and Tsukuba Construction Office (Tsukuba City, Ken-O Road Prefecture) will be implementing a night-time road closure on the inner and outer loop of the C4 Ken-o Expressway (hereinafter referred to as the "Ken-O Expressway") between Goka Interchange (hereinafter referred to as the "IC") and Tsukuba Ushiku Interchange to carry out paving work in connection with the widening to four lanes and repair and inspection of road structures.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed section, date and time

Section I: Tsukuba Chuo IC to Tsukuba Ushiku IC (inner and outer loop)
Date: September 1st (Mon) to 5th (Fri), 2025
Backup dates: Monday, September 8th to Friday, September 12th, 2025
Every night from 8pm to 5am the next morning
*Excluding weekends and holidays
Section II: Goka IC to Sakaikoga IC (inner and outer loop)
Date: September 8th (Mon) to 12th (Fri), 2025
Backup dates: Tuesday, September 16th to Friday, September 26th, 2025
Image image of closed section
  • Attached to each line C4 The indications such as indicate the route number (numbering) of Expressway.
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the same day.

2. Detour

For detours, please refer to Appendix 1 [PDF: 1.2MB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, then re-enter and transfer in the forward direction, a "transfer adjustment" will be implemented in which the toll fee will be adjusted according to the section used. (See Appendix 2 [PDF: 741KB])

Transfer IC

< Section I: Tsukuba Chuo IC to Tsukuba Ushiku IC>

Closed place Outflow designation IC Re-inflow IC
[Ken-O Road] (inner loop)
Tsukuba Ushiku IC ⇒ Tsukuba JCT
[Ken-O Road]
Tsukuba Ushiku IC, Ushiku Ami IC
[Ken-O Road]
Tsukuba Chuo IC, Joso IC,
Tsukuba Nishi Smart IC (※1), Bando IC (※2)
[Joban Expressway] (※3)
(In-bound) Yatabe IC, Yawara IC, Kashiwa IC
(Out-bound) Sakura-Tsuchiura IC, Tsuchiura Kita IC, Chiyoda Ishioka IC
[Ken-O Road] (inner loop)
Tsukuba JCT ⇒ Tsukuba Chuo IC
[Joban Expressway]
(In-bound) Sakura-Tsuchiura IC, Tsuchiura Kita IC
(Out-bound) Yatabe IC, Yawara IC
[Ken-O Road]
Tsukuba Chuo IC, Joso IC,
Tsukuba Nishi Smart IC, Bando IC
[Ken-O Road] (Outer loop)
Tsukuba Chuo IC ⇒ Tsukuba JCT
[Ken-O Road]
Tsukuba Chuo IC, Tsukuba Nishi Smart IC, Joso IC
[Ken-O Road]
Tsukuba Ushiku IC, Ushiku Ami IC, Ami Higashi IC (※4)
[Joban Expressway]
(In-bound) Yatabe IC, Yawara IC, Kashiwa IC
(Out-bound) Sakura-Tsuchiura IC, Tsuchiura Kita IC, Chiyoda Ishioka IC
[Ken-O Road] (Outer loop)
Tsukuba JCT ⇒ Tsukuba Ushiku IC
[Joban Expressway]
(In-bound) Sakura-Tsuchiura IC, Tsuchiura Kita IC
(Out-bound) Yatabe IC, Yawara IC
[Ken-O Road]
Tsukuba Ushiku IC, Ushiku Ami IC, Ami East IC
  1. ETC vehicles only
  2. Bando IC is an ETC toll gate only, but vehicles other than ETC vehicles can also use it as a re-entry IC in the event of a road closure. If you are using Bando IC in a vehicle other than ETC, please use the lane marked "support", stop temporarily, and follow the on-site information and instructions of the staff.
  3. Joban Expressway ・ ・ ・ Joban Expressway
  4. Ushikuami IC is an ETC-only toll gate, but non-ETC vehicles can also use it as an exit IC and re-entry IC when the road is closed. If you are using Ushikuami IC in a non-ETC vehicle, please use the lane marked "support," stop temporarily, and follow the on-site signs and instructions of the staff.

< Section II: Goka IC to Sakai-Furukawa IC>

Closed place Outflow designation IC Re-inflow IC
[Ken-O Road] (inner loop)
Sakai Koga IC ⇒ Goka IC
[Ken-O Road]
Sakai Furukawa IC, Bando IC
[Ken-O Road]
Goka IC, Satte IC, Shiraoka Shobu IC
[Tohoku Expressway] (※5)
(In-bound) Hasuda Smart IC (※6), Iwatsuki IC
(Out-bound) Kuki IC
[Ken-O Road] (Outer loop)
Goka IC ⇒ Sakai Koga IC
[Ken-O Road]
Satte IC, Goka IC
[Tohoku Expressway]
(Out-bound) Hasuda Smart IC (※7)
[Ken-O Road]
Sakai Furukawa IC, Bando IC, Joso IC

※5

Tohoku Expressway ・ ・ ・ Tohoku Expressway

※6

Limited to ETC vehicles of all models (12m or less)

※7

Limited to ETC vehicles of ordinary size and below

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

Ken-O Road Pavement work (paving, installation of temporary road markings, etc.) and road structure repair and inspection will be conducted between the Goka IC and Tsukuba-Ushiku IC in conjunction with the Ken-O Road 4-lane roadway conversion.
Since the section where these works will be carried out is one lane in each direction and cannot be constructed with normal lane restrictions, it will be necessary to close the section to traffic. Therefore, to avoid inconveniencing customers as much as possible, the road will be closed during weekday evenings when traffic volume is low, so that the work can be carried out intensively and efficiently.
We ask for your understanding and cooperation as this work is necessary for the safe and comfortable use of Expressway by our customers.

  • Between Goka IC and Sakai-Furukawa IC, and between Tsukuba Chuo IC and Tsukuba Ushiku IC, lane operation will be changed due to construction work to widen the road to four lanes.
    For details, please refer to Appendix 3 [PDF: 624KB].
Photo of the paving work situation Image of caption showing paving work status
Photo of temporary road marking installation Image of the caption of the temporary road marking installation situation
Photo of emergency telephone relocation Image of the caption for the emergency telephone relocation

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    “NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.