[E83] [E16] Notice of nighttime ramp closure Yokohama-Shindo Road Expressway

From Monday, June 8th to Thursday, June 18th, from 10:30 PM to 5:00 AM the following morning.
We will be carrying out repainting work on bridges.
From Monday, July 6th to Wednesday, July 15th, from 9 PM each night until 5 AM the following morning.
We will carry out repair work on the damaged pavement.

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] [E16] Notice of nighttime ramp closure Yokohama-Shindo Road Expressway

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 790KB]

May 25, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture) will implement nighttime closures on the ramps of the E83E16 Yokohama-Shindo Road Interchange (hereinafter referred to as "IC") in order to carry out bridge repainting and pavement repair work.
We sincerely apologize for any inconvenience this may cause, but we ask for your understanding and cooperation in allowing extra time when you go out.

1. Closed location and date and time

  1. Closed point
  2. Road name Closed point period
    E83E16
    Yokohama-Shindo Road

    ① Shin-Hodogaya IC
    Ramp for exiting the Yokohama Yokohama-Shindo Road (In-bound) towards the Fujitsuka Interchange.

    ② Shin-Hodogaya IC
    Ramp for merging from Yokohama Yokosuka Road In-bound to Yokohama-Shindo Road In-bound.

    Closure ①②
    June 8th (Mon) - 18th (Thu)
    Each day from 10:30 PM to 5:00 AM the following morning

    Closure ①②
    July 6th (Monday) to 15th (Wednesday)
    Each day from 9 PM to 5 AM the following morning

    Image of closed area
  3. Date and time
Closure ①②
Dates: June 8th (Mon) - 18th (Thu), 2026
Reserve dates: June 19th (Fri) - 30th (Tue), 2026
Excluding Saturdays and Sundays
10:30pm to 5am each day
Closure ①②
Dates: July 6th (Mon) - 15th (Wed), 2026
Reserve dates: July 16th (Thu) - 27th (Mon), 2026
Excluding Fridays, Saturdays, Sundays, and public holidays
Each day from 9:00 PM to 5:00 AM the following morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Bus operation

Closure times ①②:
Sotetsu buses (route: Hama 17) operating on In-bound lane Yokohama-Shindo Road are running as usual.
Closure times ①②:
Sotetsu Bus (Route: Hama 17) operating on In-bound lane Yokohama-Shindo Road is expected to experience delays after 9 PM due to a partial detour, but will be running as usual.

3. Detour

For information on alternative routes, please refer to the attached document [PDF: 280KB].
The detour will increase travel time, so please allow ample time for your journey.

Four. Construction overview

We will be carrying out bridge repainting and pavement repair work on the ramps of Yokohama-Shindo Road Hodogaya Interchange.
The section to be worked on is one lane and a ramp merging point. Since the work cannot be carried out with normal lane closures, it is necessary to close the ramp at Shin-Hodogaya Interchange to carry out the work.
Therefore, to minimize inconvenience to our customers, we will close the ramps during weekday nights when traffic volume is low, and carry out the construction work intensively and efficiently. This work is necessary to ensure the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Photos of work being carried out using an aerial work platform. Image caption depicting work being performed by an aerial work platform.
Photos of the repainting work in progress Image caption for repainting work progress
Image of the product before repainting. Image caption for the pre-painting image.
Image showing the appearance after repainting. Image caption for the post-repainting image.
Image illustrating the concept of pavement repair work. Image caption for a picture of pavement repair work.
Image illustrating the concept of pavement repair work. Image caption for a picture of pavement repair work.

Five. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed through official accounts on X (formerly Twitter) and LINE.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)" (@e_nexco_kanto) Expressway information
    "NEXCO EAST (Kanto Construction Regulations)" (@e_nexco_kanto_k) Decision on implementation of construction restrictions
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.