About result of winter tire wearing situation investigation on Expressway

-November 10, 2008 implementation-

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • About result of winter tire wearing situation investigation on Expressway

November 12, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to install it early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.

The results of the survey conducted on November 10 are shown in the table below.

Compared to the previous survey (conducted on November 4th), winter tire installation rates were higher in Aomori and Akita prefectures, while in southeastern Tohoku prefectures, the installation rate was still low.

 First north snow is observed at the toll gates on November 15th last year in Kita-Tohoku and Yamagata, and on November 18th in the mountains of Miyagi prefecture and Ban-Etsu Expressway Expressway. It is expected that it will snow soon, so please wear early winter tires and drive safely.

The next survey is scheduled for November 17th.

Survey locationWinter tire installation rate【reference】
Same period last year
(November 12)
This time survey
(November 10)
Last survey
(November 4)
Tohoku Expressway Aomori IC58%43%66%
Tohoku Expressway Towada IC43%30%31%
Hachinohe Road Hachinohe IC47%twenty four%29%
Akita Expressway Akita Minami IC31%11%twenty five%
Akita Michi Yokote IC47%7%48%
Tohoku Expressway Morioka South IC27%26%twenty four%
Tohoku Expressway north Ezuriko ICtwenty four%22%22%
Tohoku Expressway Furukawa IC11%4%12%
Tohoku Expressway Sendai Miyagi IC5%5%16%
Yamagata Expressway Yamagata Kita IC23%31%9%
Yamagata Expressway Tsuruoka IC30%10%20%
Tohoku Expressway Fukushima Iizaka IC15%17%12%
Tohoku Expressway Koriyama IC22%2%12%
Ban-Etsu Expressway Aizuwakamatsu IC8%0%17%
Joban Expressway Iwaki Chuo IC8%6%1%
Tohoku23%13%20%
  • Survey method: Visually inspect the tire type of the vehicle passing through the toll booth.
    (One time: about 100 units or 30 to 60 minutes)