About result of winter tire wearing situation investigation on Expressway
-For December 1, 2008 implementation-
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation on Expressway
December 3, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to install it early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.
The results of the survey conducted on December 1 are as shown in the table below.
The current winter tire installation rate is about 100% in the north-east and 80% except in the Iwaki Chuo IC where there is little snowfall in the south-tohoku, and we are now almost ready for the winter road. If you haven't fitted winter tires yet, please do so early.
This time, the winter tire installation situation survey in the early winter season will be completed.
| Survey location | Winter tire installation rate | 【reference】 Same period last year (December 3) | |
|---|---|---|---|
| This time survey (December 1) | Last survey (November 25) | ||
| Tohoku Expressway Aomori IC | - | 100% | 100% |
| Tohoku Expressway Towada IC | 95% | 93% | 100% |
| Hachinohe Road Hachinohe IC | 93% | 92% | 100% |
| Akita Expressway Akita Minami IC | 99% | 95% | 100% |
| Akita Michi Yokote IC | - | 100% | 100% |
| Tohoku Expressway Morioka South IC | 91% | 90% | 100% |
| Tohoku Expressway north Ezuriko IC | - | 100% | 100% |
| Tohoku Expressway Furukawa IC | 91% | 72% | 92% |
| Tohoku Expressway Sendai Miyagi IC | 87% | 74% | 97% |
| Yamagata Expressway Yamagata Kita IC | 96% | 98% | 100% |
| Yamagata Expressway Tsuruoka IC | 100% | 96% | 100% |
| Tohoku Expressway Fukushima Iizaka IC | 75% | 67% | 85% |
| Tohoku Expressway Koriyama IC | 65% | 73% | 64% |
| Ban-Etsu Expressway Aizuwakamatsu IC | 93% | 79% | 100% |
| Joban Expressway Iwaki Chuo IC | 32% | 31% | 35% |
| Tohoku | 85% | 81% | 88% |
- Survey method: Visually inspect the tire type of the vehicle passing through the toll booth.
(One time: about 100 units or 30 to 60 minutes) - The Aomori IC, Yokote IC, and Kitaue Tsurugi IC have not been surveyed this time because they achieved a 100% installation rate in the previous survey.
- This material has been updated to the latest data as a supplementary material to the press release “On the start of winter tire installation status surveys on Expressway” (November 7, 2008).
Reference Winter tire installation rate change (by survey location) [PDF: 22KB]

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。