About result of winter tire wearing situation investigation on Expressway

-For December 1, 2008 implementation-

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • About result of winter tire wearing situation investigation on Expressway

December 3, 2008
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office

NEXCO EAST Tohoku Regional Head Office (Aoba-ku, Sendai, Regional Head Office president: Mikio Kashima), Check the winter tire installation status and ask the customer to install it early. Therefore, Expressway in major interchanges (IC), has implemented the mounting survey of winter tire in the early winter period.

The results of the survey conducted on December 1 are as shown in the table below.

 The current winter tire installation rate is about 100% in the north-east and 80% except in the Iwaki Chuo IC where there is little snowfall in the south-tohoku, and we are now almost ready for the winter road. If you haven't fitted winter tires yet, please do so early.

This time, the winter tire installation situation survey in the early winter season will be completed.

Survey locationWinter tire installation rate【reference】
Same period last year
(December 3)
This time survey
(December 1)
Last survey
(November 25)
Tohoku Expressway Aomori IC-100%100%
Tohoku Expressway Towada IC95%93%100%
Hachinohe Road Hachinohe IC93%92%100%
Akita Expressway Akita Minami IC99%95%100%
Akita Michi Yokote IC-100%

100%

Tohoku Expressway Morioka South IC91%90%100%
Tohoku Expressway north Ezuriko IC-100%100%
Tohoku Expressway Furukawa IC91%72%92%
Tohoku Expressway Sendai Miyagi IC87%74%97%
Yamagata Expressway Yamagata Kita IC96%98%100%
Yamagata Expressway Tsuruoka IC100%96%100%
Tohoku Expressway Fukushima Iizaka IC75%67%85%
Tohoku Expressway Koriyama IC65%73%64%
Ban-Etsu Expressway Aizuwakamatsu IC93%79%100%
Joban Expressway Iwaki Chuo IC32%31%35%
Tohoku85%81%88%
  • Survey method: Visually inspect the tire type of the vehicle passing through the toll booth.
    (One time: about 100 units or 30 to 60 minutes)
  • The Aomori IC, Yokote IC, and Kitaue Tsurugi IC have not been surveyed this time because they achieved a 100% installation rate in the previous survey.

Reference Winter tire installation rate change (by survey location) [PDF: 22KB]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。