Sendai metropolitan area ring network completed on March 27

-Route 47 between Sendai Northern Road, Rifu Shirakashidai IC-Tomiya JCT-

February 8, 2010
Sendai River National Highway Office, Tohoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism
East Japan Expressway Tohoku Regional Head Office Sendai Construction Office

Ministry of Land, Infrastructure and Transport Tohoku Regional Development Bureau and the East Expressway Co., Ltd. Tohoku Regional Head Office had been promoting the business jointly, National Highway No. 47 Sendai-Hokubu Road and opened an extension 6.6km between from Rifu Shirakashidai IC of Tomiya JCT.

With this opening, the Sanriku Transit Expressway and the Tohoku Transit Expressway will be connected to form a ring network of approximately 60km of motorways in the Sendai metropolitan area.

In addition, as an urban ring network (automobile road network that connects the entire outer area of the urban area), it will be the first line to be opened in all ordinance-designated urban areas nationwide.

  • Opening section
    From Rifu Shirakashidai IC (Miyagi-gun Rifu Machizawa Oto)
    Tomiya JCT (Kokuda, Tomiya Town, Kurokawa District)
    Length: 6.6km
  • Opening date

    Saturday, March 27, 2010, 15:00

Expected maintenance effects with completion of the ring network

  • A high-speed transportation route that directly connects the industrial bases near Sendai and Sendai Shiogama Port will be completed and access will be strengthened.
  • High-standard roads that bypass the Sendai metropolitan area will become two routes, improving redundancy.
  • It is expected that the traffic congestion on general roads will be alleviated and that the traffic environment will be improved.

Outline of the open section of the Sendaibu Sendai-Hokubu Road

Sendai-Hokubu Road is a motorway with a total length of 13.5 km. In May 2002, 5.2 km from Rifu JCT to Rifu Shirakashidai IC is open.

With this opening, a ring network of motorways in the Sendai metropolitan area will be completed.

In addition, we are proceeding with the project for the full junction of Rifu JCT (a new ramp with the direction of Matsushima) in 2010, and for the 1.7km connection between Tomiya JCT and Route 4 to be completed in 2012.

Image image of the opening section of Sendaibu Sendai-Hokubu Road
Image of business history, main structures, connected facilities, plan specifications

Completion of the Sendai metropolitan ring network

With this opening, the Sanriku Transit Expressway and the Tohoku Transit Expressway will be connected, and together with the Sendai-Tobu Road and the Sendai-Nanbu Road, a ring network of automobile exclusive roads in the Sendai metropolitan area will be completed. (Around 60km)

This will ensure smooth distribution and introduction of traffic, alleviate traffic congestion on general roads, improve roadside environment, strengthen access to industrial and logistics bases, and secure alternative functions (improvement of redundancy) in case of disaster on Tohoku Expressway It is expected to be effective.

Image image of the completion of the Sendai metropolitan ring network

Example of the effect of improving the circular network of the Sendai metropolitan area

・Improved logistics efficiency
By building a high-speed logistics network that directly connects the Sendai Central Core Industrial Park and Sendai Shiogama Port, it is expected that access will be strengthened and logistics efficiency will be improved.

Streamlining of logistics (Sen-Taipei Core Industrial Park-Sendai Shiogama Port), breakdown of H17 traffic volume (passenger cars/freight vehicles), change in the amount of freight handled at Sendai Shiogama Port (the amount of freight handled increases year by year), Sendai Image of the time required from the Core Industrial Park to Sendai Shiogama Port (reduced time is 9 minutes)

・Providing quick redundancy
With the development of the ring network, in closed to traffic at the time of the Tohoku running through the motorway, Sendai-Nanbu Road, Sendai-Tobu Road, Sanriku running through the motorway, Sendai-Hokubu Road is established quick detour route by.

Image of the detour route when the Tohoku Transit Expressway is closed and the traffic closure status (H16-H20) of the Tohoku Transit Expressway (Sendai Minami IC-Izumi IC)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.