About result of winter tire wearing situation investigation (fourth)
- Corporate Top
- Press Room
- Press Release Tohoku office
- About result of winter tire wearing situation investigation (fourth)
November 24, 2010
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office
NEXCO EAST Tohoku Regional Head Office (Aoba Ward, Sendai City), the winter tires on Expressway are being promoted in order to encourage early winter tire replacement and enlighten safe driving during the full-scale snow season. We have conducted a survey on the installation status of and announced the results.
The results of the survey conducted on November 22 are shown in the table below.
Compared to the previous survey (conducted on November 15th), the winter tire installation rate is higher in the entire Tohoku region, but it is still lower than the same period last year.
The weather is expected to fall over a large area in Tohoku this weekend. Please wear a winter tire early and drive safely.
| Survey location | Winter tire installation rate | 【reference】 | ||
|---|---|---|---|---|
| This time survey (November 22) |
Last survey (November 15) |
Same period last year (November 24) | ||
| Aomori Prefecture | Tohoku Expressway Aomori IC | 77% | 65% | 85% |
| Hachinohe Road Hachinohe IC | 57% | 63% | 96% | |
| Akita | Tohoku Expressway Towada IC | 76% | 61% | 94% |
| Akita Expressway Akita Minami IC | 65% | 62% | 85% | |
| Akita Michi Yokote IC | 60% | 57% | 85% | |
| Iwate Prefecture | Tohoku Expressway Morioka South IC | 64% | 32% | 87% |
| Tohoku Expressway north Ezuriko IC | 60% | 41% | 98% | |
| Miyagi Prefecture | Tohoku Expressway Furukawa IC | 32% | 23% | 38% |
| Tohoku Expressway Sendai Miyagi IC | 41% | 38% | 69% | |
| Yamagata Prefecture | Yamagata Expressway Yamagata Kita IC | 65% | 57% | 77% |
| Yamagata Road Kushibiki PA | 73% | 75% | 70% | |
| Fukushima Prefecture | Tohoku Expressway Fukushima Iizaka IC | 32% | 29% | 34% |
| Tohoku Expressway Koriyama IC | 39% | 33% | 53% | |
| Ban-Etsu Expressway Aizuwakamatsu IC | 38% | 30% | 73% | |
| Joban Expressway Iwaki Chuo IC | 33% | 14% | 23% | |
| Tohoku Regional Head Office | 54% | 44% | 70% | |
The next survey is scheduled for November 29th (announced December 1st).
(The survey date and publication date are subject to change without notice due to weather conditions.)
- Survey method: Visually check the tire type of the vehicle passing through the general lane at the tollgate. (One time: 100 units or 30 minutes or more)
- "IC" stands for interchange, "PA" stands for parking area.
This document is based on a press release "About the results of the winter tire installation situation survey (first)-Starting efforts to promote early replacement of winter tires-(November 4, 2010)" It is a continuous survey.
In order to use the winter highway safely, securely and comfortably, NEXCO EAST enlightenment activities at SA, PA, IC, traffic safety campaign, "Drupa" HP 's winter highway We actively send out information such as lectures ".
* Dr. Mammoshi: A researcher specializing in car and snow road safety

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
関連サイト・コンテンツ
料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。
リアルタイムの渋滞・規制情報をお探しの方はこちら。
災害時の通行止めなどの道路情報をお探しの方はこちら。