[E49] Ban-Etsu Expressway Iwaki Sanwa IC and Ono IC Some lamps
About enforcement of night traffic

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E49] Ban-Etsu Expressway Iwaki Sanwa IC and Ono IC Some lamps About implementation of night closure

September 19, 2017
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Office Iwaki Management Office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) E49 Ban-Etsu Expressway Iwaki Sanwa Interchange (IC) and Ono IC ramps, we will carry out night-time closures as follows for measures to prevent falling and to repair pavement.

Expressway This work is necessary to maintain a safe and comfortable environment. Thank you for your understanding and cooperation.

1 closed place

Ban-Etsu Expressway

  • Iwaki Sanwa IC
    Inflow ramp (C ramp) to the Out-bound main line (Koriyama area)
    Outflow lamp (D lamp) from the Out-bound line (in the direction of Iwaki)
  • Ono IC
    Outflow lamp (D lamp) from the Out-bound line (in the direction of Iwaki)

2 Regulation period

  • Iwaki Sanwa IC
    5 nights from October 2 (Mon) - October 6 (Fri), 2017
    Preliminary day: October 10 (Tue) - October 16 (Mon), 2017
  • Ono IC
    9 nights from October 23 (Mon), 2017 ~ November 2 (Thu), 2017
    Preliminary day: November 6 (Mon) - November 16 (Thu), 2017
  • As a general rule, there are no restrictions on Saturdays, Sundays and public holidays.
  • If the weather becomes worse or worse, we will stop the work.
  • The regulation period and regulation time may change depending on the progress.

3 time limit

From 22:00 pm to 6:00 the next morning

4 detour

Attachment-1 【PDF: 948KB】

Image of detour

5 Construction content

・Scrap prevention measures: We will implement concrete fragment prevention measures.

Iwaki Sanwa IC C/D lamp
Image image of Iwaki Sanwa IC C/D lamp
Ono IC D lamp
Image of Ono IC D lamp

・Pavement repair work: We will repair the pavement where cracks are prominent.

Ono IC D lamp Pavement damage situation
Ono IC D lamp Image image of pavement damage situation

6 Information provision

It will be postponed if there is a risk of rainfall or strong wind.
If the weather is bad or there is a possibility of deterioration, we may suspend work and cancel the road closure.
Depending on the progress of the construction work, the road closure may be canceled before the scheduled time.
In addition, the decision on whether to stop at night will be made at 11:00 on the day of the implementation.

[Customer contact]

  • NEXCO東日本お客さまセンター(24時間オペレーターが対応します)
    0570-024-024 または 03-5338-7524
  • ハイウェイテレホン(24時間音声案内)
    郡山局 TEL 024-961-1620
  • (公財)日本道路交通情報センター
    050-3369-6761(東北地方・高速道路情報)
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.