[E4A] Aomori Expressway (Between Aomori JCT and Aomori East IC)
About enforcement of night traffic

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E4A] Aomori Expressway (Aomori JCT-Aomori Higashi IC) Night Closure

October 10, 2017
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Aomori Management Office

NEXCO EAST Aomori Management Office (Aomori Prefecture, Aomori Prefecture), the provisional 2 lane section (one lane on one side)E4A Aomori Expressway Aomori Junction (JCT) and Aomori Higashi Interchange (IC), we will carry out night traffic closures for pavement repair work, maintenance work, tunnel equipment inspection, etc. as follows.

In order to minimize the impact on traffic, we will carry out traffic closures at night when traffic volume decreases. Expressway This work is necessary to maintain a safe and comfortable environment. We appreciate your understanding and cooperation.

1 closed section

Aomori Expressway Aomori JCT-Aomori East IC (upper line) Attachment [PDF: 131KB]

2 suspension period

Tuesday, October 24, 2017
(Preliminary date: October 25 (Wed), October 26 (Thu))

Image of closed period

3 closed hours

From 20:00 to 6:00 the next day

4 detour

National Route 7 Aomori Ring Road Attachment [PDF: 131KB]

Image of detour

5 Construction content

We will perform pavement repair work, maintenance work, equipment inspection in the tunnel, etc.

・ Pavement repair work
We will repair the places where cracks and steps on the pavement surface are noticeable.

Image image of pavement repair work

・ Inspection of equipment in tunnel
We will carry out equipment inspections in tunnels to maintain a safe road environment.

Image image of equipment inspection in tunnel

6 Information provision

It will be light rain, but it will be postponed if there is a risk of heavy rain and strong wind.
If the weather is bad or there is a possibility of deterioration, we may suspend work and cancel the road closure.
As soon as construction/inspection is completed, the traffic closure may be canceled earlier than planned.
In addition, the decision on whether to stop at night will be made at 16:00 on the day of implementation.

[Customer contact]

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.