[E6] Joban Expressway (between Soma IC and Shinchi IC)
Implementation of nighttime closure

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway (between Soma IC and Shinchi IC) Nighttime closure

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 282KB】

February 4, 4th year of Reiwa
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki management office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) removed the rockfall protection fence from the E6 Joban Expressway Soma Interchange (IC) to the Shinchi IC on the provisional two-lane section (one lane on each side). Due to construction work, etc., we will close the road at night as follows.
Therefore, when you go out, please leave with plenty of time, and when you drive, please detour to National Highway No. 6 etc.
We apologize for the inconvenience caused to customers who use the Expressway, but we ask for your understanding and cooperation in the construction work necessary to use the Expressway safely and comfortably.

1. Closed section

Joban Expressway between Soma IC and Shinchi IC (upper and lower lines)

Location map
Image of position map

2. Closed date and time

Joban Expressway between Soma IC and Shinchi IC (upper and lower lines)
Reiwa 4th February 28th (Monday) -March 9th (Wednesday) 20:00 every night to 5:00 the next day
[Preliminary day: Thursday, March 10th, Friday, March 11th]

  • The nighttime closure will be from 20:00 on weekdays to 5:00 the next morning.
    (Friday night work will be done until early Saturday morning)
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

3. Detour

 国道6号、国道115号、国道113号 (別添資料-1【PDF:742KB】

Four. Construction content

Around 268.9KP on the Joban Expressway, the rockfall protection fence will be removed and a temporary guardrail will be installed because the slope excavation has been completed.

Image image of rockfall guard fence 1
Image image of rockfall guard fence 2
Rockfall guard rail

Five. Regarding transit fare adjustment due to suspension of traffic

別添資料-2【PDF:358KB】

For passengers who leave the Expressway once due to a nighttime suspension and bypass the closed section and transfer again in the same direction, we will make a "transit adjustment" to adjust the toll according to the section used.

6. How to obtain traffic information

  • DraPla", a site full of useful information on Expressway nationwide
    【address】
    PC version (https://www.driveplaza.com/)
    Mobile version (http://m.driveplaza.com/)
    Smartphone version (http://www.driveplaza.com/smp/)
  • Expressway traffic information service "Drive Traffic (DraTra)"
    (https://www.drivetraffic.jp/construction-regulation)
    It provides real-time road traffic information and traffic congestion prediction.
    【address】
    PC version (https://www.drivetraffic.jp/)
    Mobile version (http://m.drivetraffic.jp/)
    Smartphone version (http://www.drivetraffic.jp/smp/)
  • NEXCO東日本お客さまセンター
    24時間365日オペレーターが応対いたします。
    【電話番号】
    0570-024-024 または 03-5308-2424
  • 日本道路交通情報センター(JARTIC)
    【電話番号】
    全国共通ダイヤル 050-3369-6666 (携帯短縮ダイヤル #8011
    ※全国どこからでも最寄りの情報センターに接続します。
    福島情報 050-3369-6607
    東北地方高速情報 050-3369-6761
  • Highway radio
    Highway radio (AM1620kHz)
    The section that is broadcasting is indicated by the sign on Expressway.
  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.