[E6] Joban Expressway between Minamisoma IC and Shinchi IC (upper and lower lines)
Implementation of nighttime road closures

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway between Minamisoma IC and Shinchi IC (upper and lower lines) Nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 807KB]

March 6, 2023
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki Management Office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) repairs the pavement from E6 Joban Expressway Minamisoma Interchange (IC) to Shinchi IC in a temporary 2-lane section (one lane on one side). Due to construction work, the road will be closed at night as follows.
Therefore, when leaving, please leave with plenty of time and take a detour to National Route 6, etc. when driving.
We apologize for the inconvenience caused to customers using Expressway, but we ask for your understanding and cooperation in the construction necessary for safe and comfortable use Expressway.

1. Closed section

Joban Expressway between Minamisoma IC and Shinchi IC (upper and lower lines)

(Location map)

Image image of closed section

2. Closed date and time

Joban Expressway between Minamisoma IC and Shinchi IC (upper and lower lines)
April 3 (Mon) to 26 (Wed), 2023
20:00 - 5:00 [18:00]

  • Nighttime traffic closures are from 8:00 p.m. to 5:00 a.m. on weekdays.
    (Friday night traffic will be closed until 5:00 on Saturday morning.)
  • The Minamisobakajima Service Area, which is in the closed section, will also be closed during the above hours.
  • It may be canceled depending on the weather, so please check the latest information from websites such as "DraTra" when using the Expressway.
Image of closed days

【Usage Guide】

Image of [Legend]

3. Detour

Prefectural Route 12, National Route 6, National Route 113
(Attachment-1 [PDF: 265KB])

Four. Construction content

Pavement repair work
Pavement repair work will be carried out between Minamisoma IC and Shinchi IC.

Photo before construction
Before construction
Photo after construction (image)
After construction (image)

Five. Regarding transit fare adjustment due to nighttime road closures

Attachment-2 [PDF: 127KB]

For customers who temporarily run out of the Expressway due to nighttime traffic closures, turn the road closure section and transfer in the same direction again, we will adjust the toll according to the section used.

6. How to obtain traffic information

  • Official Twitter account "NEXCO EAST (Tohoku)" ( @e_nexco_tohoku ) Also delivers information.
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.