[E48] Yamagata Expressway up and down Nishikawa IC - Gassan IC
Nighttime road closure notice

June 16th (Monday) to June 20th (Friday) 8pm to 6am
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E48] Yamagata Expressway northbound and southbound lanes, Nishikawa IC to Gassan IC, nighttime road closures

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 387KB]

May 16, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Yamagata Management Office

NEXCO EAST The Yamagata Management Office (Yamagata City, Yamagata Prefecture) will close the E48 Yamagata Expressway (hereinafter referred to as "Yamagata Road") up and down line from the Nishikawa Interchange (hereinafter referred to as "IC") to the Gassan IC for pavement repair work during the night.
We apologize for any inconvenience this may cause and ask for your understanding and cooperation in allowing extra time for your trip.

1. Closed section and date and time

  1. Closed section:
    Yamagata Expressway, up and down lanes, Nishikawa IC to Gassan IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • The signs such as E48 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    Monday, June 16, 2020 to Friday, June 20, 2020
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    Monday, June 23, 2020 to Wednesday, June 25, 2020
    Every day from 20:00 to 6:00 the next morning
Image of date and time

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to the attached document [PDF: 135KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Construction overview

Yamagata Expressway Upper and lower lines Nishikawa IC ~ Tsukiyama IC Due to damage to the road surface, pavement repair work will be carried out. In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Advance notice signs and digital cameras will be posted at nearby toll booths and rest facilities.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.