[E7] Nihonkai-Tohoku Expressway, both directions, Sakata Chuo IC to Sakata Minato IC
Shonai Airport IC - Sakata IC Sakata IC - Sakata Chuo IC
Nighttime road closure notice

From Tuesday, August 19th to Friday, September 26th, from 8pm to 6am the following morning
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Notice of nighttime road closures on Nihonkai-Tohoku Expressway Expressway, Sakata Chuo IC to Sakata Minato IC, Shonai Airport IC to Sakata IC, Sakata IC to Sakata Chuo IC

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 934KB]

July 18, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Tsuruoka Management Office

At NEXCO EAST Tsuruoka Management Office (Tsuruoka City, Yamagata Prefecture), E7 Nighttime road closures will be implemented on Nihonkai-Tohoku Expressway (hereinafter referred to as the "Nitto Expressway") from Sakata Chuo Interchange (hereinafter referred to as the "IC") to Sakata Minato IC on both inbound and outbound lanes, from Shonai Airport IC to Sakata IC on both inbound and outbound lanes, and from Sakata IC to Sakata Chuo IC on both inbound and outbound lanes to carry out pavement repair work, etc.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed section and date and time

  1. Closed section:
    [1] Nitto Expressway, both inbound and outbound lanes, Sakata Chuo IC to Sakata Minato IC
    [2] Nitto Expressway, both directions, Shonai Airport IC to Sakata IC
    [3] Nitto Expressway, both inbound and outbound lanes, Sakata IC to Sakata Chuo IC
  2. Image image of closed section
    • The signs such as E7 attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    [1] August 19th (Tuesday) to September 1st (Monday), 2020
    8:00pm to 6:00am the following morning (excluding weekends and holidays)
    [2] September 5th (Friday) to September 10th (Wednesday), 2020
    8:00pm to 6:00am the following morning (excluding weekends and holidays)
    [3] Wednesday, September 17, 2020 - Friday, September 26, 2020
    From 20:00 to 6:00 the next morning
    9/19 (Fri), 9/22 (Mon), excluding weekends and holidays
    Preparation day:
    [1] September 2, 2020 (Tuesday) to September 4, 2020 (Thursday)
    From 20:00 to 6:00 the next morning
    [2] September 11th (Thursday) to September 16th (Tuesday), 2020
    From 20:00 to 6:00 the next morning
    9/12 (Fri), excluding weekends and holidays
    [3] September 29th (Monday) to September 30th (Tuesday), 2020
    From 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to Appendix 1 [PDF: 217KB], Appendix 2 [PDF: 220KB], and Appendix 3 [PDF: 150KB].
The detour will increase travel time, so please allow yourself plenty of time when traveling.

3. Construction overview

Since the road surface is damaged between the Nitto Expressway upper and lower lines Shonai Airport IC ~ Sakata Minato IC, pavement repair work will be carried out. In order to minimize inconvenience to our customers, we will close the road at night on weekdays when traffic is low, and carry out construction intensively and efficiently. This is necessary for the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Pavement repair work Photo of the work situation
Pavement repair work Work progress photo

4. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.