[E6] Joban Expressway up and down Shinchi IC - Yamamoto IC
Notice of road closure at night

September 16th (Tue) to October 2nd (Thu) from 8pm to 5am each day
~We will carry out pavement repair work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Joban Expressway Up and Down Line Shinchi IC - Yamamoto IC Notice of nighttime traffic closure

The latest regulatory information isDraTraPlease see.

PDF version [PDF:536KB]

August 19, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai East Management Office

NEXCO EAST Sendai East Administrative Office (Sendai City, Miyagi Prefecture) will be implementing night-time road closures on both the E6 Joban Expressway (hereinafter referred to as the "Joban Expressway") in both directions from Shinchi Interchange (hereinafter referred to as the "IC") to Yamamoto IC to carry out pavement repair work and other works.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.

1. Closed section and date and time

  1. Closed section:
    Joban Expressway northbound and southbound, Shinchi IC to Yamamoto IC
  2. Image image of closed section
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    September 16th (Tuesday) - October 2nd (Thursday), 2020
    Every night from 20:00 to 5:00 the next morning
    • Excluding weekends and holidays
    • Excluding Friday, September 19th and Monday, September 22nd
    Preparation day:
    October 3rd (Friday) - October 15th (Wednesday), 2020
    Every night from 20:00 to 5:00 the next morning
    • Excluding weekends and holidays
    • Except Friday, October 10th
Image of date and time

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

When detouring, Attachment-1 [PDF: 182KB] Please refer to.
Detours will increase the time required, so please take time to go out.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, then re-enter and transfer in the forward direction, a "transfer adjustment" will be implemented, in which the toll will be adjusted according to the section used. (See Appendix 2 [PDF: 157KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.
  • Minamisoma Kashima Smart IC and Tori no Umi Smart IC are only available to vehicles with ETC.

Four. Construction overview

Due to damage to the road surface on both the Shinchi IC and Yamamoto IC lines of the Joban Expressway, pavement repair work will be carried out. In order to minimize inconvenience to customers, the road will be closed at night on weekdays when traffic volume is low, and the work will be carried out in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.

photo of pavement damage photo
Pavement damage pictures
Image after pavement repair
Image after pavement repair

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.