[E6] Sendai Sendai-Tobu Road In-bound) Natori Chuo Smart IC
Notice of nighttime closure of entrance ramp

November 5th (Wednesday) from 9pm to 5am
~ Pavement repair work will be carried out ~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Sendai Sendai-Tobu Road In-bound) Natori Chuo Smart IC Entrance Ramp Nighttime Closure Notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 440KB]

October 3, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Sendai East Management Office

NEXCO EAST Sendai Higashi Management Office (Sendai City, Miyagi Prefecture) will be closing the entrance ramp to the In-bound Chuo Smart Interchange (hereinafter referred to as the "IC") on the E6 Sendai-Tobu Road (hereinafter referred to as the "Tobu Road")'s northbound lanes at night due to pavement repair work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when going out.

1. Closed location and date and time

  1. Closures:
    Tobu Expressway In-bound Natori Chuo Smart IC entrance ramp
  2. Image of closed area
    Geographical Survey Institute (Geographical Survey Institute) Processed by East Japan Expressway Co., Ltd.
    • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    Wednesday, November 5, 2020
    21:00 pm-5 pm the next morning
    Preparation day:
    Thursday, November 6th to Friday, November 7th, 2020
    Every day from 21:00 to 5am the next morning
Image of date and time

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For detours, please refer to the attached document [PDF: 209KB].
The detour will increase travel time, so please allow yourself plenty of time.

3. Construction overview

At the entrance ramp of the Natori Chuo Smart IC In-bound line on the Eastern Expressway, the pavement is deteriorating, so repair work will be carried out.
Since construction cannot be carried out with normal lane regulations when carrying out construction, it is necessary to close the ramp and carry out the work. Therefore, in order to avoid causing as much inconvenience as possible to customers, we will close the ramps on weekday nights when there is little traffic, and carry out the construction intensively and efficiently. This is a necessary construction for you to use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Image of damage situation
Damage situation
Image of the repair
Image after repair

4. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    Highway radio sections are indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

関連サイト・コンテンツ

ドライバーズサイト(ドラぷら)

料金・ルート検索、サービスエリア・パーキングエリアの情報をお探しの方はこちら。

ドライブトラフィック(ドラとら)

リアルタイムの渋滞・規制情報をお探しの方はこちら。

NEXCO東日本(道路防災情報)公式Xへ

災害時の通行止めなどの道路情報をお探しの方はこちら。