[E7] Akita Expressway upper and lower lanes, Yatsuryu IC to Noshiro Minami IC, nighttime road closures

From Tuesday, July 21st to Wednesday, July 22nd, from 8 PM to 6 AM the following morning.
We will be carrying out pavement repair work, etc.

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E7] Akita Expressway upper and lower lanes, Yatsuryu IC to Noshiro Minami IC, nighttime road closures

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 513KB]

June 19, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Akita Management Office

NEXCO EAST At the Akita Management Office (Akita City, Akita Prefecture), a nighttime road closure will be implemented from E7 Akita Expressway (hereafter "Akita Expressway") Hachiryu Interchange (hereafter "IC") to Noshiro Minami IC for pavement repair work and other purposes.
We sincerely apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you can allow extra time when you go out.

1. Closed section and date and time

  1. Closed section:
    Akita Expressway, both inbound and outbound lanes, Yatsuryu IC to Noshiro Minami IC
  2. Image image of closed section
    • The E7 display attached to the route indicates the route number (numbering) of Expressway, etc.
  3. Date and time
    Implementation date:
    July 21st (Tuesday) to July 22nd (Wednesday), 2020
    Every day from 20:00 to 6:00 the next morning
    Preparation day:
    July 23rd (Thursday) to July 24th (Friday), 2020
    Every day from 20:00 to 6:00 the next morning
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 125KB].
The detour will increase your travel time, so please allow ample time for your journey.

3. Construction overview

Due to road surface damage occurring on the Akita Expressway both directions Hachiryu IC ~ Noshiro Minami IC, we will carry out pavement repair work. To minimize inconvenience to customers, we close roads on weekday nights when traffic is low, allowing for concentrated and efficient construction. This construction is necessary to ensure safe and comfortable use of the Expressway, so we appreciate your understanding and cooperation.

Photograph of pavement repair area
Pavement repair location
Image after pavement repair
Image after pavement repair

4. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • Information is also distributed on the official X (formerly Twitter) account.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.