[E6] Notice of nighttime road closure on Joban Expressway both directions, between Joban-Tomioka IC and Minamisoma IC.

August 24th (Mon) - September 16th (Wed), from 8 PM to 5 AM each day.
~We will be carrying out lane operation switching work, etc.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • [E6] Notice of nighttime road closure on Joban Expressway both directions, between Joban-Tomioka IC and Minamisoma IC.

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 602KB】

July 24, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Iwaki Management Office
Tohoku Regional Head Office, Iwaki Construction Office

NEXCO EAST Iwaki Management Office (Iwaki City, Fukushima Prefecture) and Iwaki Construction Office (Iwaki City, Fukushima Prefecture) will implement nighttime road closures on both the inbound and outbound lanes of the E6 Joban Expressway (hereinafter referred to as "Joban Expressway") between the Joban Tomioka Interchange (hereinafter referred to as "IC") and the Minamisoma IC to carry out lane operation switching work.
We sincerely apologize for any inconvenience this may cause, but we ask for your understanding and cooperation in allowing extra time when you go out.

1. Closed section and date and time

  1. Road closure section:
    Joban Expressway, both directions: Joban-Tomioka IC to Minami-Soma IC
  2. Image image of closed section
    • Attached to each line E6 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    Monday, August 24, 2020 - Wednesday, September 16, 2020
    Open daily from 8 PM to 5 AM the following morning, excluding Saturdays, Sundays, and public holidays.
    Preparation day:
    Monday, September 28, 2020 - Thursday, October 8, 2020
    Open daily from 8 PM to 5 AM the following morning, excluding Saturdays, Sundays, and public holidays.
Image of date and time
Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 285KB].
The detour will increase your travel time, so please allow extra time for your journey.

3. Regarding transit adjustments due to suspension of traffic

For customers who temporarily leave Expressway due to road closures, bypass the closed section, re-enter and transfer in the forward direction, we will implement "transfer adjustment" in which the toll will be adjusted according to the section used. Masu. (See Attachment 2 [PDF: 159KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the road closure is lifted after exiting at an exit IC, the toll will be adjusted even if you re-enter from an IC in the road closure section in the forward direction or from an exit IC.
  • Naraha Smart IC and Minamisoma Kashima Smart IC are only accessible to ETC-equipped vehicles.

Four. Construction overview

On Joban Expressway in both directions, between the Joban-Tomioka IC and the Minami-Soma IC, lane switching work will be carried out to expand the section to four lanes. As this work requires construction on areas used by customers, it will be necessary to close the road to carry out the work. To minimize inconvenience to customers, the road closure will be carried out during weekday nights when traffic volume is low, allowing for concentrated and efficient work. This work is necessary to ensure the safe and comfortable use of Expressway, so we ask for your understanding and cooperation.

Image of lane operation switching work
車線運用切替工事 イメージ写真

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Advance notice signs, flyers and digital signage will be posted at nearby toll booths and rest facilities.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.