[E4A] Hachinohe Expressway both directions, Nango IC to Hachinohe IC
[E4A] Hachinohe Expressway both directions, Hachinohe JCT to Hachinohe JCT tollgate
Nighttime road closure notice

From 8 PM on Tuesday, October 27th to 6 AM the following morning
~We will be removing the gate-type support posts for the information board.~

  • Corporate Top
  • Press Room
  • Press Release Tohoku office
  • Notice of nighttime road closures on Hachinohe Expressway (both directions) between Nango IC and Hachinohe IC, and between Hachinohe Expressway JCT and Hachinohe JCT tollbooth.

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 282KB】

September 28, 2020
East Nippon Expressway Co., Ltd.
Tohoku Regional Head Office Hachinohe Management Office

NEXCO EAST The Hachinohe Management Office (Hachinohe City, Aomori Prefecture) will implement a nighttime road closure at the E4A Hachinohe Expressway (hereafter "Hachinohe Road") Nango Interchange (hereafter "IC") to Hachinohe IC and Hachinohe Junction (hereafter "JCT") to the Hachinohe JCT toll gate to remove gate-type pillars from the information boards.
We sincerely apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you can allow extra time when you go out.

1. Closed section and date and time

  1. Road closure section:
    Hachinohe Expressway, both directions: Nango IC to Hachinohe IC
    Hachinohe Expressway, both directions, Hachinohe JCT to Hachinohe JCT tollgate
  2. Image image of closed section
    • The signs such as E4A attached to each route indicate the route number (numbering) of Expressway, etc.
  3. Date and time
    [Date of implementation]
    Tuesday, October 27, 2020
    One night [8 PM to 6 AM the following morning]
    【Preparation day】
    Wednesday, October 28, 2020 - Friday, October 30, 2020
    Of these, one night [8 PM to 6 AM the following morning]
Image of date and time
  • One of the three nights

Usage Guide

Legend image image
Two-dimensional code image link to NEXCO EAST (Tohoku) X (formerly Twitter) (external link)
  • In stormy weather, it will be postponed to the spare day.
  • The decision to proceed with construction will be announced on X (formerly Twitter), etc.

2. Detour

For information on alternative routes, please refer to Attachment 1 [PDF: 319KB].
The detour will increase your travel time, so please allow extra time for your journey.

3. Regarding transit adjustments due to suspension of traffic

For customers who exit Expressway due to a road closure, detour around the closed section, and then re-enter to continue their journey in the same direction, a "transfer adjustment" will be implemented to adjust the toll based on the sections used. (See Attachment 2 [PDF: 208KB])

How to use transit adjustment

ETC customers

  • For customers using ETC, please drive wirelessly at designated outflow ICs, and also wirelessly drive at re-inflow ICs. (Transfer certificates are not issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

Customers such as cash

  • Customers paying with cash, etc. should receive a "transfer certificate" at the outflow designated IC, then take a "transit ticket" at the re-inflow IC, and then take the "transition certificate" at the toll booth where they pay the toll for the first time. Please hand over your ``book'' and ``traffic ticket.''

Common to ETC and cash customers

  • If the road closure is lifted after exiting at an exit IC, the toll will be adjusted even if you re-enter from an IC in the road closure section in the forward direction or from an exit IC.
  • Hachinohe-Nishi Smart Interchange is only accessible to vehicles with ETC (Electronic Toll Collection) systems.

Four. Construction overview

At the Nango IC ~ Hachinohe IC on both the Hachinohe Expressway (both directions), we will remove the unwanted gate-type pillars due to the information board renewal work. To minimize inconvenience to our customers, we will close the road on weekday nights when traffic is low, and carry out the work intensively and efficiently. This work is necessary for safe and comfortable use of the Expressway, so we ask for your understanding and cooperation.

Photo of the gate-type support pillars to be removed.
Gate-type support posts to be removed

5. How to obtain information about Expressway

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Expressway information available before you leave

(3) Expressway information available while using Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road information can be obtained from devices equipped with VICS-compatible car navigation systems.
  • The official account of X (formerly Twitter) also provides information about Expressway.
    "NEXCO EAST (Tohoku)" (@e_nexco_tohoku)
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.

Related Sites and Content

Driver's site (DraPla)

If you are looking for information on fares, routes, service areas and parking areas, please click here.

Drive Traffic (DraTra)

If you are looking for real-time traffic congestion and restriction information, click here.

NEXCO EAST (Road Disaster Prevention Information) Official X

Click here if you are looking for road information such as road closures during disasters.