Nagano Expressway Asahi IC between Sarah IC (Out-bound line) We are repairing the paved road surface of the tunnel.

-When you go out on Saturdays, Sundays, and holidays, please take time to go out-

October 11, 2013
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

NEXCO EAST Kanto Regional Head Office (Taito-ku, Tokyo) is a tunnel from Nagano Expressway (Nagano Road) Asahi Interchange (IC) to Sarahae IC (Out-bound line) towards Nagano. We are doing repair work.

The Nagano Expressway (Out-bound line) Ipponmatsu Tunnel has a deformation at the bottom of the tunnel due to the influence of the surrounding ground.

In order to provide a safe, secure, and comfortable road space, concrete will be newly installed at the bottom of the tunnel to strengthen the tunnel structure, and at the same time, work on countermeasures will start from August 29 to repair damage to the pavement surface. Doing.

In the construction work, traffic restrictions that reduce the number of lanes need to be enforced day and night, including Saturdays, Sundays, and holidays, and traffic jams occur on Saturdays, Sundays, and holidays. Especially during the mornings and evenings during the three consecutive holidays, there is heavy traffic due to construction work. Up to 9km It has occurred to some extent.

We apologize for the inconvenience, and we appreciate your understanding and cooperation. Also, when you go out, please take time to go out.

1 Outline of regulations

(1) Regulated points Nagano road (Out-bound line) Between Asahi IC and Sarah IC
(2) Regulation period and traffic congestion forecast

From Thursday, August 29, 2013 to Saturday, November 30

During the construction period, the number of lanes that can be driven will decrease from 2 lanes to 1 lane, so traffic congestion is expected to continue on weekends and holidays.

[Prediction of traffic congestion from regulatory points]

Image image of traffic congestion prediction from regulation points

2 Construction overview

( Attachment 1 [PDF: 201KB] )

This is the repair work for the Ipponmatsu tunnel between Nagano road Asahi IC and Sarah IC (Out-bound line).

Since damage to the paved road surface of the tunnel is progressing this time, new concrete under the tunnel and paved road surface will be repaired as full-scale repair work before traffic is affected.

In addition, since it will take time to construct the concrete at the bottom of the tunnel body, and the construction will be done for each lane, the construction will be carried out under the day-night continuous lane regulation.

By installing new concrete at the bottom of the tunnel body, we will strengthen the tunnel structure and repair damage to the paved road surface to improve safety.

We ask for your understanding and cooperation so that our customers can use the Expressway safely.

3 Implementation status

Currently, construction is being carried out by restricting the overtaking (right) lane, and as soon as this work is completed, the restrictions will be switched to work on the traveling (left) lane.

[Photo of the construction]

Image image of a photo of the construction

4 Detour

We will guide you around the road map of the area including general roads, so please consider the route to be used with reference to road traffic information etc. (" Attachment 2 [PDF: 291KB] )). Please note that we will not adjust the charges even if you make a detour.

5 How to obtain road traffic information

(1) Day/night lane regulation posters, leaflets, etc.

  • We will post and distribute posters and leaflets in the service area (SA), parking area (PA), etc.
  • Banners will be posted on Joshinetsu Expressway, Nagano Expressway, Chuo Expressway and overpass bridges for general roads.
  • We will post a construction notice signboard at the toll booth and SA/PA.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while driving

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • VICS
    Road traffic information can be obtained with VICS-compatible onboard equipment such as car navigation.
  • Highway Information Terminal
    Wide-area road information is provided in an easy-to-understand manner on the monitor screens installed in SA / PA.

August 26, 2013 Press Release "Notice of continuous lane regulation between Nagano Expressway Asagi IC and Sarah IC (Out-bound) Please refer also to.

Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.