Expressway /Traffic status of national highways during the Obon period (breaking news) [national version]

From Thursday, August 6, 2015 to Sunday, August 16: 11 days
*Comparison target is August 7th (Thursday) to August 17th (Sunday) of the previous year: 11 days

  • Corporate Top
  • Press Room
  • Press Release Headquarters
  • Expressway /Traffic status of national highways during the Obon period (breaking news) [national version]

August 17, 2015
Road Bureau, Ministry of Land, Infrastructure, Transport and Tourism
East Nippon Expressway Co., Ltd.
Central Japan Expressway Co., Ltd.
West Japan Expressway Co., Ltd.
Honshu-Shikoku Expressway Co., Ltd.

1 Expressway traffic

  • Traffic during the Obon period has increased by about 3% compared to last year.
  • The number of traffic jams over 10km was 443, an increase of 6 compared to last year.
  • This year, compared to last year, the weather was blessed, so both traffic volume and the number of traffic jams exceeded last year.

(1) Traffic volume during the period
 Main sections of Expressway nationwide (simple average of 27 sections on 8 pages) [PDF: 90KB]

H27 year results (1)H26 year results (2)Contrast (1) / (2)
Average daily traffic volume48,400 units/day46,900 units/day103%
Maximum daily traffic57,000 units/day56,200 units/day101%

(2) Congestion status
Number of traffic jams (Number of traffic jams over 10km includes traffic count over 30km)

Congestion extensionH27 year results (1)H26 year results (2)Contrast (1)-(2)
Traffic congestion of 10 km or more443 times437 times+6 times
Traffic congestion of 30 km or more28 times27 times+1 time

Particularly long congestion points at each company

Company classificationVertical lineRoad nameTraffic jam locationTraffic jam date and time (peak)Congestion extensionCause of traffic jam
East JapanOut-bound lineKan-Etsu ExpresswayNear Hanazono ICThursday, August 13, around 8:1047.1kmTraffic concentration and accident
In-bound lineKan-Etsu ExpresswayNear Tsurugashima ICFriday, August 14th, around 19:2549.0 kmTraffic concentration and accident
Central JapanOut-bound lineChuo ExpresswayNear Fujino PASaturday, August 8 around 10:3547.9kmTraffic concentration and accident
In-bound lineTomei ExpresswayNear Yamato TNSunday, August 9 around 18:0535.7kmTraffic concentration
Western Japan / HonshiOut-bound lineChinese roadNear Takarazuka East TNAround 8:50 on Saturday, August 833.1kmTraffic concentration and accident
In-bound lineKyushu RoadNear Hirokawa ICSaturday, August 15, around 18:0531.4kmTraffic concentration and accident

2 National highway traffic

(Related documents 9-12 pages) [PDF: 692KB]

(1) Traffic volume nationwide during the period
Major sections of national highways nationwide (simple average of 32 sections totaling 9 to 10 pages)

 H27 year results (1)H26 year results (2)Contrast (1) / (2)
Average daily traffic volume31,400 units / day30,600 units/day103%

(2) Traffic volume around sightseeing spots during the period
Major sections of national highways around tourist destinations (simple average of a total of 30 sections on pages 11 to 12)

 H27 year results (1)H26 year results (2)Contrast (1) / (2)
Average daily traffic volume26,100 units/day24,900 units/day105%

3 topics

  1. Traffic trends of NEXCO 3 companies and Honshi (3-4 pages of related materials) [PDF: 92KB]
  2. Traffic conditions after opening the entire Joban Expressway (5 pages of related materials) [PDF: 342KB]
  3. Traffic situation around the section opened in June on the Ken-O Road (6 pages of related materials) [PDF: 311KB]
  4. Ken-O Road H26_nendokaitsukukanshuhen'nokotsujokyo (Related page 7) [PDF: 342KB]
Image image of image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.