"Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • "Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"

October 23, 2019
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office

 E18 Joshin-Etsu Expressway Usui-Karuizawa IC-Saku IC is currently operating in two-way traffic (one lane each up and down) using the In-bound line due to the embankment deformation caused by typhoon No. 19. I will.
4 for the early of traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider this recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC) , The 1st Technical Study Meeting will be held with the following schedule.

1 date and time

Technical Study Group 2019 Scheduled for mid-November 1st year (The date and time will be announced as soon as it is decided.)

2 places

East Nippon Expressway Co., Ltd. Saku Management Office Meeting Room

3 members

 Attachment [PDF: 39KB] As of

4 proceedings

  • Damage situation, cause
  • Study on this restoration method
  • Monitoring system, etc.

5 Other

  • The study meeting will be held privately.
  • After the study meeting is held, the results of the study will be announced.

Attachment

Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.