"The 2nd Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- "The 2nd Joshin-Etsu Expressway, Nagano Expressway for the holding of the glue surface measures and Technical Review Board"
January 24, 2020
East Nippon Expressway Co., Ltd.
Kanto Regional Head Office
E18 Joshin-Etsu Expressway between Usui Karuizawa IC and Saku IC is currently operating face-to-face (upper and lower lanes) using the In-bound line due to the occurrence of embankment deformation due to the effect of typhoon 19. .
4 Toward the traffic resumed in the lane, "according to the experts Joshin-Etsu Expressway, Nagano Expressway in Slope measures and Technical Review Board", and to consider the recovery method of the relevant section (Usui Karuizawa IC ~ Saku IC), the second The following technical study meeting will be held.
1 date and time
Monday, January 27, 2020 13:00 to 15:00
2 places
East Nippon Expressway Co., Ltd. Kanto Regional Head Office Meeting Room
3 members
Attachment [PDF: 49.6KB] As of
4 proceedings
- Field survey results
- Dynamic observation results
- Future monitoring system
- Future recovery policy, etc.
5 Other
- The study meeting will be held privately.
- After the study meeting is held, the results of the study will be announced.
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.
Related Sites and Content
If you are looking for information on fares, routes, service areas and parking areas, please click here.
If you are looking for real-time traffic congestion and restriction information, click here.
NEXCO EAST (Road Disaster Prevention Information) Official X
Click here if you are looking for road information such as road closures during disasters.