[C4] Between Kanzaki IC and Taiei JCT on the Ken-O Ken-o Expressway
Notice of nighttime closure

March 29th (Monday) -April 2nd (Friday) From 20:00 to 5:00 the next morning
-We will install wire ropes and inspect road structures-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [C4] Notice of nighttime closure between Kozaki IC and Taiei JCT on the Ken-O Ken-o Expressway

The latest regulatory information isDraTraPlease see.

PDF version 【PDF: 948KB】

March 12, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Chiba Management Office

NEXCO EAST Chiba Management Office (Chiba City, Chiba Prefecture) is located on the C4 Ken-o Expressway (hereinafter "Ken-O Road Expressway") Kanzaki Interchange (hereinafter "IC") -Taei Junction (hereinafter "Taei"). Between "JCT"), we will close the road at night in order to install wire ropes and inspect road structures.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. Closed section and date and time

(1) closed to traffic section: Ken-O Road within the outer loop Kanzaki IC ~ Daiei JCT

Closed to traffic section: Ken-O Road within the outer loop Kanzaki IC ~ Daiei JCT image of
  • Attached to each line C4 The indications such as indicate the route number (numbering) of Expressway.

(2) Date and time

Implementation date:
Reiwa 3rd March 29th (Monday) -April 2nd (Friday)
From 20:00 to 5am the next day
Preparation day:
April 5th (Monday) to 9th (Friday), 3rd year of Reiwa
From 20:00 to 5am the next day
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In stormy weather, it will be postponed to the spare day.
  • Construction decision will be announced on Twitter, etc. around 17:00 in the evening.

2. Detour

For detours, please check the following according to the closed section and the direction of travel.
The detour will take longer, so please leave plenty of time.

  1. [Kozaki IC ⇔ Daiei IC]
    Ken-O Road Ken-O Higashi-Kanto Expressway (hereinafter referred to as "Higashi Kanto Expressway") Out-bound line (from Hachioji to Itako)
    Or
    From the Higashi Kanto Expressway In-bound line to the Ken-O Road O Expressway inner loop (from Itako to Hachioji) When passing
    Detour (1) Pink arrow As you can see, please use National Route 356, Prefectural Road 110, and National Route 51.
    If you detour between Kozaki IC and Daiei IC, it will take about 20 minutes (usually about 13 minutes).
  2. [Kozaki IC⇔Narita IC]
    Ken-O Road Ken-O Expressway to the Higashi Kanto Expressway In-bound line (from Hachioji to Chiba) Or
    From the Higashi Kanto Expressway Out-bound line to the Ken-O Road O Expressway inner loop (from Chiba to Hachioji) When passing
    Detour (2) Blue arrow As you can see, please use Route 356, Route 408, and Route 295.
    If you detour between Kozaki IC and Narita IC, it will take about 33 minutes (usually about 13 minutes).
Image of detour (1) [Kozaki IC⇔Daiei IC] and detour (2) [Kozaki IC⇔Narita IC]

3. Regarding transit adjustments due to suspension of traffic

For passengers who temporarily flow out of the Expressway due to suspension of traffic, bypass the suspension of traffic, re-enter, and transfer in the forward direction, we carry out "transit adjustment" to adjust the toll according to the segment used. I will.

Transfer designated IC

Closed place Outflow designation IC Re-inflow designated IC
(1) [Ken-O Road] (Inner loop)
Taiei JCT ⇒ Kozaki IC
[Higashi Kanto Expressway]
(In-bound) Daiei IC, Katori Sawara IC
(Out-bound line) Narita IC, Tomisato IC
[Ken-O Road]
(Inner loop) Kozaki IC, Inashiki Higashi IC, Inashiki IC
(2) [Ken-O Road] (Outer loop)
Kozaki IC ⇒ Taiei JCT
[Ken-O Road]
(Outside) Kozaki IC, Inashiki Higashi IC
[Higashi Kanto Expressway]
(In-bound line) Narita IC, Tomisato IC, Shisui IC
(Out-bound line) Daiei IC, Katori IC

(1) [Ken-O Road (inner loop) Daiei JCT⇒ Kanzaki IC

(1) [Ken-O Road (inner loop) Daiei JCT⇒ Kanzaki IC image of

(2) [Ken-O Road (outer loop) Kanzaki IC⇒ Daiei JCT

(2) [Ken-O Road (outer loop) Kanzaki IC⇒ Daiei JCT image of

How to use transit adjustment

<< ETC customers >>

  • Customers using ETC are requested to run the outflow designated IC wirelessly and the re-inflow designated IC wirelessly. (No transit certificate will be issued for ETC vehicles)
  • ETC time zone discount will be applied, considering the transited journey as one.
    Toll charges are adjusted at the time of billing, so they may differ from those displayed at the toll gate.
  • Insert the same ETC card for all journeys and pass through the ETC lane at the tollgate.

<< Customers for cash, etc. >>

  • Customers who pay by cash, etc. should receive the "passage certificate" at the outflow designated IC, and then get the "passport" at the re-inflow designated IC, and then make the "transfer" at the toll booth that pays the fare first. Please give us your "certificate" and "passport".

《Common to customers such as ETC and cash》

  • If the suspension of traffic is released after the outflow designated IC is released, the fare will be adjusted even if it is re-introduced from the IC (including the outflow designated IC) in the closed road section in the forward direction.

Four. Construction overview

Ken-O Road Between Kanzaki IC and Taiei JCT, we will carry out wire rope installation work to prevent head-on collision accidents in the provisional two-lane section and inspection work for maintenance of road structures.
In order to minimize the impact on customers, we will close traffic on weekday nights when traffic is light, and carry out construction work intensively and efficiently. This work is necessary to use Expressway safely and comfortably, so we ask for your understanding and cooperation.

Wire rope installation work image of work situation
Road structure inspection work status image image

Five. How to obtain traffic information

(1) Guidance by bulletin board

  • A notice sign will be posted along the toll gates and detours in the vicinity.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • iPhone / Android app "E-High Radi"
    Keiyo Road, Higashi Kanto Road, and New Airport Road, emergency information such as accidents and falling objects that occurred in the immediate direction of travel is delivered in real time.
    https://www.driveplaza.com/traffic/e-highwayradio/
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.