[E16] Yokohama Yokosuka Road Asahina IC entrance lamp Notice of closing at night

December 13th (Monday) to 14th (Tuesday) from 22:00 pm each day to 5:00 the next morning
-We will carry out reverse-way driving measures, etc.-

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E16] Yokohama Yokosuka Road Asahina IC entrance lamp Notice of closing at night

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 450KB]

November 29, 3rd year of Reiwa
East Nippon Expressway Co., Ltd.
Keihin Management Office

At NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture), reverse run countermeasure work and road surface repair work are carried out at the entrance ramp of the E16 Yokohama Yokosuka Road (hereinafter "Yokosuka Road") Asahina Interchange (hereinafter "IC"). We will carry out a night closure to do so.
We apologize for the inconvenience caused to our customers, but we ask for your understanding and cooperation so that you will have time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed place
    Yokosuka Road Up and Down Line Asahina IC Entrance Lamp
  2. Image of closed area
    • Attached to each line E16 The indication such as shows the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    December 13th (Monday) to 14th (Tuesday), 3rd year of Reiwa
    Every day from 22:00 to 5:00 the next morning
    Preparation day:
    December 15th (Wednesday) to 16th (Thursday), 3rd year of Reiwa
    Every day from 22:00 to 5:00 the next morning
Image of closing date
Two-dimensional code image link to NEXCO EAST (Kanto construction regulations) twitter (external link)
  • In case of rain, it will be postponed to the spare day.
  • We will inform you of the implementation decision on Twitter etc. around 17:00 on the day.

2. Detour

Please refer to the figure below for the detour.
If you detour the Yokosuka Road Asahina IC ⇒ Konandai IC as shown by the blue arrow in the figure below, it will take about 13 minutes (usually about 4 minutes).
If you detour the Yokosuka Road Asahina IC ⇒ Horiguchi Nokendai IC as shown by the light blue arrow in the figure below, it will take about 14 minutes (usually about 5 minutes).
If you detour the Yokosuka Road Asahina IC ⇒ Zushi IC as shown by the orange arrow in the figure below, it will take about 17 minutes (usually about 5 minutes).
If you detour the Yokosuka Road Asahina IC ⇒ Shutoko Koura entrance as shown by the pink arrow in the figure below, it will take about 17 minutes (usually about 6 minutes).
The detour will take longer, so please leave plenty of time.

Image of detour

3. Construction overview

At the entrance ramp of the Asahina IC on the sideways road, we will carry out reverse-way driving countermeasure work (road marking, color pavement) to prevent reverse-way driving accidents on the Expressway and road surface repair work due to damage to the paved road surface.
The section where this work is to be carried out is one lane, and it is not possible to carry out the work under normal lane regulations when carrying out the work, so it is necessary to close the lamp and carry out the work. To avoid inconvenience to our customers, we will close the lamps on weekday nights when there is little traffic, and carry out the construction intensively and efficiently. We ask for your understanding and cooperation as this work is necessary to use the Expressway safely and comfortably.

Image image of reverse-way driving countermeasure example
Image image of paved road surface damage situation

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on the official Twitter account.
    " NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
    " NEXCO EAST (Kanto construction regulations)" (@e_nexco_kanto_k) Judgment regarding implementation of construction regulations
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.