[E83] Yokohama-Shindo Road Fujitsuka IC entrance ramp night closure notice

From February 26th (Monday) to February 27th (Tuesday) from 10pm to 5am each day
~We will carry out pavement repair work and work to prevent reverse driving~

  • Corporate Top
  • Press Room
  • Press Release Kanto Regional Head Office
  • [E83] Yokohama-Shindo Road Fujitsuka IC entrance ramp night closure notice

The latest regulatory information isDraTraPlease see.

PDF version [PDF: 449KB]

February 9, 2020
East Nippon Expressway Co., Ltd.
Keihin Management Office

NEXCO EAST Keihin Management Office (Yokohama City, Kanagawa Prefecture) has closed the entrance ramp of the E83 Yokohama-Shindo Road Fujitsuka Interchange (hereinafter referred to as "IC") at night to perform pavement repair work and work to prevent wrong-way driving. To do.
We apologize for any inconvenience this may cause to our customers, but we ask for your understanding and cooperation so that you have plenty of time to spare when you go out.

1. 1. Closing location and date and time

  1. Closed location:
    Yokohama-Shindo Road Fujitsuka IC entrance ramp
  2. Image of closed area
    • Attached to each line E83 The indications such as indicate the route number (numbering) of Expressway.
  3. Date and time
    Implementation date:
    February 26th (Monday) to February 27th (Tuesday), 2020
    Every day from 22:00 to 5:00 the next morning
    Preparation day:
    Wednesday, February 28, 2020 - Thursday, February 29, 2020
    Every day from 22:00 to 5:00 the next morning
Image of date and time
Two-dimensional code image link to NEXCO EAST (Kanto Construction Regulations) X (formerly Twitter) (external link)
  • In case of rain, it will be postponed to the spare day.
  • The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.

2. Detour

To detour, please use the Shin-Sakuragaoka IC entrance as shown in the diagram below.
If you take a detour via the Kawashima Iwama Line and Loop Route 2 as indicated by the  blue arrow, it will take approximately 7 minutes instead of the usual 3 minutes.

Image of detour
Image of [Legend]

3. Construction overview

Due to damage to the road surface at Yokohama-Shindo Road Fujitsuka IC entrance ramp, we will carry out pavement repair work and work to prevent wrong-way driving Expressway (road markings, colored pavement).
The section where this work will be carried out has one lane, and since the work cannot be carried out under normal lane regulations, it is necessary to close the ramp. To minimize inconvenience to customers, ramps will be closed on weekday nights when traffic is light, and construction will be carried out intensively and efficiently.
This work is necessary to ensure safe and comfortable use Expressway, so we ask for your understanding and cooperation.

Pavement repair work work status photo
Image of caption of work status for pavement repair work
Reverse run countermeasure construction work status photo
Reverse driving countermeasure work image of the caption of the work situation

Four. How to obtain traffic information

(1) Guidance by distribution / posting

  • Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
  • A banner will be posted on the overpass on the Expressway.

(2) Road traffic information that can be obtained before going out

(3) Road traffic information available while using the Expressway

  • Road information board
  • Highway radio (AM1620kHz)
    The highway radio section is indicated by signs on the Expressway.
  • Highway Information Terminal
    We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA.
  • VICS
    You can get road traffic information with VICS-compatible car navigation and other on-board devices.
  • Information is also distributed on official X (formerly Twitter) and LINE accounts.
    [X (old Twitter)]
    "NEXCO EAST (Kanto)"
    (@e_nexco_kanto) Real-time traffic information
    "NEXCO EAST (Kanto construction regulations)"
    (@e_nexco_kanto_k) Decision to implement construction regulations
    [LINE]
    "NEXCO EAST" (@e-nexco) Road closures and weather information
Image link (external link) to download page of Adobe Acrobat Reader

To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have​​​ Download from here (free)Please use it.