[C3] Gaikan Expressway Wako Kita IC and Soka IC
Nighttime ramp closure notice
~We will carry out work to repair damaged pavement and replace soundproof walls~
- Corporate Top
- Press Room
- Press Release Kanto Regional Head Office
- [C3] Notice of nighttime ramp closures at Wako Kita IC and Soka IC Gaikan Expressway
The latest regulatory information isDraTraPlease see.
June 9, 2025
East Nippon Expressway Co., Ltd.
Misato Management Office
NEXCO EAST Misato Management Office (Misato City, Saitama Prefecture) will be closing the ramps at the interchange (hereinafter referred to as "IC") on the C3 Gaikan Expressway (hereinafter referred to as "Outer Ring Expressway") to carry out pavement repairs and soundproof wall replacement work.
We apologize for any inconvenience this may cause, and we ask for your understanding and cooperation in allowing yourself plenty of time when heading out.
1. Lamp closure location and date and time
| number | Road name | Closed point | period | Attachment |
|---|---|---|---|---|
| ① | C3 Outer ring road | Wako Kita IC (Outer loop exit ramp) | June 23rd (Monday) to 25th (Wednesday) Every night from 9pm to 5am the next morning |
Document-1 [PDF: 315KB] |
| ② | Soka IC (Outer loop entrance ramp) | June 30th (Monday) - July 9th (Wednesday) [Excluding weekends] 9pm to 4am each day |
Document-2 [PDF: 356KB] |
- Attached to each line C3 The indications such as indicate the route number (numbering) of Expressway.
- In the event of bad weather, the event will be postponed to the backup day.
Please refer to the attached document [PDF: 571KB] for information on backup dates and detours in case of postponement. - The decision to carry out construction will be announced on X (formerly Twitter) etc. around 5:00 pm on the day of construction.
2. Construction overview
Work will be carried out on the Outer Ring Road due to damage to the road surface at Wako Kita IC and damage to the soundproof wall at Soka IC.
Since construction work cannot be carried out under normal lane restrictions, it is necessary to close the ramps to carry out the work. Therefore, in order to minimize inconvenience to customers, we will close the ramps at night on weekdays when traffic volume is low, and carry out the work in a concentrated and efficient manner. This work is necessary to ensure that customers can use Expressway safely and comfortably, so we ask for your understanding and cooperation.
3. How to obtain traffic information
(1) Guidance by distribution / posting
- Notice signs, posters and leaflets will be posted at toll booths and rest facilities nearby.
(2) Road traffic information that can be obtained before going out
- NEXCO東日本お客さまセンター(24時間オペレーターが対応)
ナビダイヤル:0570-024-024
または:03-5308-2424 - NEXCO EAST Expressway Traffic Information Site "DraTra"Real-time information[Mobile] http://m.drivetraffic.jp/Construction regulation information
- 日本道路交通情報センター(JARTIC)道路交通情報
全国共通ダイヤル 050-3369-6666
(携帯電話短縮ダイヤル #8011)
※全国どこからでも最寄りの情報センターに接続します。
全国・関東甲信越情報 050-3369-6600
埼玉情報 050-3369-6611
【PC】https://www.jartic.or.jp/
(3) Road traffic information available while using the Expressway
- Road information board
- Highway radio (AM1620kHz)
The highway radio section is indicated by signs on the Expressway. - Highway Information Terminal
We will inform you of road information in an easy-to-understand manner by the monitor screens installed in SA / PA. - VICS
You can get road traffic information with VICS-compatible car navigation and other on-board devices.
- Information is also distributed on official X (formerly Twitter) and LINE accounts.
[X (old Twitter)]
"NEXCO EAST (Kanto)" (@e_nexco_kanto) Real-time traffic information
“NEXCO EAST (Kanto Construction Regulations)” (@e_nexco_kanto_k) Judgment on implementation of construction regulations
[LINE]
“NEXCO EAST” (@e-nexco) Weather information and road closures
To view the PDF file, you need the Adobe Systems plug-in software "Acrobat Reader (Japanese version)". If you do not have Download from here (free)Please use it.